Renovation of a mixed-use development in Chattanooga, Tennessee. Completed plans call for the renovation of a hospitality development; and playground / park / athletic field.

This request for bids is for a contract to furnish all material, equipment, supplies and labor necessary to perform roof replacements, gutters, siding, hood repair (non-powered), windows, and painting. This project requires a full BC or a BC-B contractor, or a contractor with the following subcategories; BC-6, BC-11, BC-12, BC-14, and a BC-21. General Conditions 1) On-Site work shall be performed between contract award and June 15, 2024, unless an exception is granted by the Facilities Management Regional Manager. Work in this area must be coordinated with Park Staff to work with the Rental Schedule. 2) All work shall comply with state-approved versions of the IBC, standards, regulations, other applicable codes, manufacturer's recommendation, and best practices. Contractor is responsible for all permits and associated fees. 3) Only the Facilities Management Office can approve any alterations, modifications, or substitutions to the written scope, specifications, or requirements of the project. No additional work shall be authorized unless pre-approved by the Facilities Management Office. 4) Contractor shall keep the jobsite clean and safe and leave in a neat and tidy manner. 5) All color selections to be determined by the Park or Hospitality Manager and approved by the Facilities Management Office. 6) All material substitutions must be pre-approved. 7) All materials shall be installed per manufacturer's recommendation and best practice. 8) Contractor is responsible for verifying actual dimensions prior to ordering any materials or bidding. No allowances shall be made due to any bidder neglecting to visit the site and verifying dimensions and conditions. General Specifications 1) Group Camp Assembly Hall - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-foot of roof edge, drip edge, valleys, plumbing boots and lay new architectural shingles with no valleys to be seen. c. Replace damaged porch ceiling with like materials. d. Replace all soffit, fascia with new Cedar Texture Engineered Treated wood boards. All cuts shall be primed and painted with High Quality 100% Acrylic paint before installing. A minimum 3/16-inches should be left between joints. e. Replace damaged downspout with like materials. f. Install new hinges and door closers on all exterior doors to match existing. g. Repair damaged siding on front of building with like materials. h. Pressure wash structure and allow at least 48 hours to dry before caulking or painting. i. Caulk as required, prime and paint all siding and trim with two coats of paint with colors to be chosen by Park Staff. 2) Group Camp Cabins 1-6 - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-foot of roof edge, drip edge, and lay new architectural shingles. c. Replace all windows with Low E, Energy Star rated vinyl windows to match existing. d. Install new hinges and door closers on all doors to match existing. e. Repair any damaged siding and trim with like materials. f. Pressure wash structures and allow at least 48 hours to dry before caulking or painting. g. Replace all soffit, fascia with new Cedar Texture Engineered Treated wood boards. All cuts to be primed and painted with High Quality 100% Acrylic paint before installing. h. Caulk as required, prime and paint all trim and siding with two coats of paint with colors to be chosen by Park Staff. 3) Group Camp Shelter - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-foot of roof edge, drip edge, Electrical Mast Roof Flashing, and lay new architectural shingles. c. Replace all fascia with new Cedar Texture Engineered Treated wood boards. All cuts shall be primed and painted with High Quality 100% Acrylic paint before installing. d. Install new gutters, gutter guards, downspouts, and splashguards to match existing. e. Paint all posts, fascia, and decking with two coats of paint to be chosen by Park Staff. 4) Group Camp Bath House - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-feet of roof edge, drip edge, plumbing boots and lay new architectural shingles. c. Replace all soffit, fascia and trim with new Cedar Texture Engineered Treated wood boards. All cuts shall be primed and painted with High Quality 100% Acrylic paint before installing. A minimum 3/16-inches should be left between joints. d. Remove all siding, repair any sheathing to create a suitable surface to install new non-woven house wrap. e. Install new Cedar Texture Engineered Treated wood board and batten siding and new 'M' and 'W' lettering. All cuts to be primed and painted with High Quality 100% Acrylic paint before installing. A minimum 3/16-inches should be left between joints. f. Install new treated 45-degree beveled 2x12-inch board at bottom of siding to protect the siding from weed-eater damage. g. Caulk as required, prime and paint with two coats of paint with colors to be chosen by Park Staff. 5) Group Lodge Shelter - The contractor shall: a. Remove all existing roofing materials and repair any deteriorated decking with like materials. b. Install new underlayment with ice and water shield on lower 3-feet of roof edge, drip edge, chimney flashing and lay new architectural shingles. c. Replace all fascia with new Cedar Texture Engineered Treated wood boards. All cuts to be primed and painted with High Quality 100% Acrylic paint before installing. A minimum 3/16-inches should be left between joints. d. Install new gutters, gutter guards, downspouts, and splashguards to match existing. e. Re-work hood for proper airflow. f. Paint all posts, fascia, and decking with two coats of paint to be chosen by Park Staff.

Post-Bid

Playgrounds / Parks / Athletic Fields

$2,940,000.00

Public - State/Provincial

Renovation

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
32
Bidding Soon
829
All Active Projects
371
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2023

January 23, 2024

img_map_placeholder

5801 Champion Rd, Chattanooga, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.