BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Norwalk, Ohio. Completed plans call for site work for a water / sewer project.

As of 01/05/2023 it has been awarded. Contract A was awarded to Underground Utilities for $7,032,522.00 and Contract B for $1,437,814.00 Contract A Description: Construction of a new sanitary interceptor sewer consisting of approximately 9,000 linear feet of 48-inch sewer pipe, lateral reconnections, pipe abandonment, and the modification of multiple combined sewer overflow structures. Opinion of Probable Construction Cost: $7,400,000.00 Substantial Completion: 510 days from Contract Time commencement Final Completion: 540 days from Contract Time commencement Contract B Description: Rehabilitation sections of the sewer system consisting of approximately 8,200 linear feet of Cured-in-Place-Pipe (CIPP) lining, and the application of structural liner to approximately 35 manholes. Opinion of Probable Construction Cost: $1,300,000.00 Substantial Completion: 330 days from Contract Time commencement Final Completion: 360 days from Contract Time commencement Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the Wage Rates, various insurance requirements, various equal opportunity provisions, various requirements for project funding through the Water Pollution Control Loan Fund (WPCLF) via the Ohio EPA, and the requirement of the payment bond and performance bond for one hundred percent (100%) of the contract price. Attention of bidders is called to Ohio revised Code Section 153.12 which states that NO contract shall be entered into if the price of the Bids for the project, are in excess of ten percent (10%) above the Engineer's estimate. The City of Norwalk, reserves the right to waive any informalities or to reject any or all bids. The City of Norwalk may, at its discretion, award a contract to the lowest and best bidder. Bid Result - Contract A - Underground Utilities - 7,032,522.00 Contract B - Inliner Solutions - 1,437,814.00

Award

Water / Sewer

$8,470,336.00

Public - City

Site Work

66

16

42

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
74
Bidding Soon
1,285
All Active Projects
423
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2023

January 8, 2024

img_map_placeholder

Multiple Locations, Norwalk, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.