BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Norman, Oklahoma. Completed plans call for the renovation of a conference / convention center.

Oklahoma City Convention Center Service Corridor Upgrades. Question Deadline 11/27/2023 at 12:00 PM CT. Estimated Amount: $700,000.00. Bid security percent:5% Liquidated Damages. Liquidated damages are for failure to complete work on time. The time for completion of the work is of the essence in this Contract. Liquidated damages will be assessed listed below: $500 Per Calendar Day. The sum of money thus deducted for each delay, failure or non-completion is not to be considered as a penalty but shall be deemed, taken and treated as reasonable liquidated damages since it would be impracticable and extremely difficult to fix the actual damages caused by such delay. Once Substantial Completion is achieved, the Contractor shall have 60 days to complete the punch list and all outstanding work. If punch list and all outstanding work is not complete after 60 days referenced above, liquidated damages shall be assessed at a rate of $2,000 per calendar day until work is complete. The procedure for an ASI/SI that does not require a change in the scope of work or impact cost of construction or extend the Contract time is as follows The City will consider and reserve the right to reject any or all Bids, and all Bids submitted are subject to this reservation. Questions and Answers deadline in Periscope will be moved to November 29, 2023 5:00:00 PM CST., in Lieu of November 27 th 2023 at 12:00:00 PM CST.

Award

Conference / Convention Centers

$327,300.00

Public - City

Renovation

5

17

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
41
Bidding Soon
421
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

January 5, 2024

img_map_placeholder

100 Mick Cornett Dr, Norman, OK


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.