BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Concord, New Hampshire. Completed plans call for site work for a water / sewer project.

the Sealed Envelope Should Be Plainly Marked: B09-24 Cip 85 Water Main Replacement Project, Lawrence Street & Pembroke Road Concord, Nh Bids May Be Issued Only by the Purchasing Manager, or His/her Designee, to Authorized Firms and Are Not Transferable Unless Authorized by the Purchasing Manager, or His/her Designee. Each Bid Shall Be Accompanied by a Certified Check, Cash, Check Drawn by a New Hampshire Bank, or Bid Bond for and Subject to Conditions Provided in the Instruction to Bidders. the Amount of Such Bid Deposit Shall Be Ten Percent (10%) of the Total Bid, Made Payable to the City of Concord, New Hampshire. The Successful Bidder Will Be Required to Furnish a Performance Bond and a Separate Payment Bond Each in the Amount of One Hundred Percent (100%) of the Contract Price. Progress Payments: on Not Later Than the Last Day of Every Month, the Contractor Shall Prepare and Submit an Invoice Covering the Total Quantities of Work That Have Been Completed From the Start of the Job Up to and Including the Last Day of the Preceding Month Together With Such Supporting Evidence as Required by the City. Retainage: the City Shall Retain a Portion of the Progress Payments, Each Month, in Accordance With the Following Procedures: 1.until Work is 50% Complete, as Determined by the City, Retainage Shall Be 10% of the Monthly Payments Claimed. the Computed Amount of Retainage Shall Be Deposited in a Noninterest-bearing Account Established by the City. 2.after the Work is 50% Complete, and Provided the Contractor Has Satisfied the City in Quality and Timeliness of the Work, and Provided Further That There is No Specific Cause for Withholding Additional Retainage No Further Amount Shall Be Withheld. 3.upon Substantial Completion, the Amount of Retainage Shall Be Reduced to 2% of the Total Contract Price Plus an Additional Retainage Based on the City's Estimate of the Fair Value of the Punch List Items and the Cost of Completing and/or Correcting Such Items of Work, With Specified Amounts for Each Incomplete or Defective Item of Work. as These Items Are Completed or Corrected, They Shall Be Paid Out of the Retainage Until the Entire Project is Declared Completed. the Final 2% Retainage Shall Be Held, in the Non-interest-bearing Account, During the Two-year Warranty Period and Released Only After the City Has Accepted the Project. Liquidated Damages: in the Event That the Contractor Fails to Satisfactorily Complete the Work Contemplated and Provided for Under This Contract, on or Before the Date of Completion, the City Shall Deduct From the Payments Due the Contractor Each Month, the Sum of One Thousand Dollars ($1,000.00) Plus Engineering Charges Per Day for Each Calendar Day of Delay, Which Sum is Agreed Upon Not as a Penalty, but as Fixed and Liquidated Damages for Each Day of Such Delay, to Be Paid in Full and Subject to No Deduction. if the Payments Due the Contractor Are Less Than the Amount of Such Liquidated Damages Said Damages Shall Be Deducted From Any Other Monies Due or to Become Due the Contractor or Shall Be Paid by the Contractor's Surety. The City Reserves the Right to Reject Any or All Bids or Any Part Thereof, to Waive Any Formality, Informality, Information and/or Errors in the Proposal, to Accept the Proposal Considered to Be in the Best Interest of the City, or to Purchase on the Open Market if It is Considered in the Best Interest of the City to Do So. Failure to Submit All Information as Detailed on the Bid Submission Checklist and/or Submission of an Unbalanced Bid Are Sufficient Reasons to Declare a Proposal as Non-responsive and Subject to Disqualification. All questions regarding this IFB shall be submitted in writing no later than December 12, 2023 @ 5:00 PM

Award

Water / Sewer

$525,738.00

Public - City

Site Work

15

5

4

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
96
Bidding Soon
2,088
All Active Projects
855
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

April 1, 2024

img_map_placeholder

Multiple Locations, Concord, NH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.