BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Ogden, Utah. Conceptual plans call for the renovation of a transportation facility.

It is unknown exactly how and when that the Ogden Airport / Ogden City acquired ownership of Hangar S-755. However, Ogden City has leased out the use of this hangar for decades. Fair Air was the tenant about 7-10 years ago and went out of business owing the City better than $50K. When Fair Air was leasing the hangar, they subleased to Cornerstone Aviation. Once Fair Air failed, Cornerstone and a new upstart entity, Utah Aircraft Maintenance stepped up and took over payments to maintain their presence in the hangar. The hangar has been marginally maintained over a long period of time. Recently, the City has been catching up with the long deferred maintenance. Essentially, the City's building and code enforcement inspected the hangar under the same criteria that would be used if someone outside the City owned the hangar. This created a significant list of repairs and replacements that were required. Most all repairs have been accomplished outside one major replacement ... the replacement of the large west facing electric roll-up hangar door. The current door is decades old. It is a "top-end" Atlas roll-up door in two sections to create the large hangar opening. This door has cost several thousands each year in repairs. First the City covered all of the repair costs, then part of the burden was placed on the tenant. Parts for a proper repair are not available and only adlib modification are keeping the door functioning. On January 29th, 2023, the door malfunctioned and was damaged beyond any easy repair. A replacement is needed in the next several weeks Fiscal year 2024-2028 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Transportation Terminals

$7,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
27
Bidding Soon
550
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

img_map_placeholder

3909 Airport Rd, Ogden, UT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.