Renovation of a library in Sequim, Washington. Completed plans call for the renovation of a library.

Sequim Library Temporary Space Improvements Questions may be directed to Brian Phillips, Facilities Manager, at 360-417-8500 x 7743 or bphillips@nols.org. Prospective bidders should refer to the Job Scope and Bidding Instructions in order to ensure compliance with specific requirements for submissions. The Job Scope is as follows: Demolition Phase 1. Remove three walls as shown on Plan a. Remove electrical outlet and wiring from office wall to nearest junction box b. Remove interior window from office 2. Remove carpet and carpet adhesive from proposed new hallway and office areas 3. Remove cabinet from near front entrance as shown on Plan a. Disconnect and remove electrical outlet in cabinet and pull wire back to junction in remaining cabinet (printer/copier cabinet) 4. Remove sink, sink cabinet, toilet and dispensers from proposed ADA restroom 5. Remove existing doorknobs from two restrooms 6. Remove shelving section from storage area as shown on the Plan 7. Remove utility sink and cap supply and drain pipes 8. Disconnect light fixture in proposed hallway from switch in office (hall light to remain ON all the time, i.e., with no switch) 9. Remove bars and plastic protective material from front windows and doors 10. Unless noted elsewhere or otherwise approved by NOLS, all items removed during demolition, including all demolition debris, are to be disposed of by the Contractor in compliance with WA State laws and regulations Construction Phase 1. Hallway - provide accessible pathway to restrooms a. Scrape, clean and polish floor where carpet has been removed b. Construct new hallway/staff area wall as shown on Plan i. new wall is 8' high ii. install gypsum board on one side only of new wall between the staff area and the hallway - finished side facing the hallway (east) iii. texture and paint wall surfaces to match adjacent existing walls iv. paint wall surfaces v. install wall base c. Construct new hallway/office wall as shown on Plan i. new wall is to office ceiling height ii. install sound blocking insulation in new wall iii. install gypsum board to both sides of new office wall iv. texture and paint wall surfaces to match adjacent existing walls v. install wall base d. Install 35" wide door to staff area i. hollow core door, no window ii. trim - levers both sides, passage function e. Relocate ceiling light to center of hallway f. Install directional LED exit/emergency light in hallway 2. Restroom Vestibule a. Construct new wall as shown on Plan between restroom vestibule and storage area i. new wall is 8' high ii. install gypsum board on one side of new wall facing restroom vestibule (east side) iii. texture and paint finished side of new wall surfaces to match existing adjacent walls iv. install wall base b. Install 35" wide door in new wall to storage area i. hollow core door (possibly reuse old hall door) ii. trim - levers with passage function c. Install wall mounted light above restroom doors, no switch/on all the time 3. ADA Restroom - create accessible restroom with appliances designed and installed to conform to ICC A117.1 a. Install code compliant toilet b. Install code compliant wall hung sink with lever handled faucet c. Install horizontal and vertical grab bars as required by code d. Install accessible restroom product dispensers e. Install accessible door trim (levers) with privacy function f. Install occupancy sensing motion activated light switch 4. Non-ADA Restroom a. Install accessible door handles (levers) with privacy function b. Install occupancy sensing motion activated light switch 5. Utility Room a. Install sink as shown on Plan 6. Office a. scrape, clean and polish floor where carpet has been removed b. install 35" half-light solid core door i. trim - levers with classroom function (key locks/unlocks from outside office, always passage from inside office) c. install data ports (x2) as shown on Plan d. install network cables (x2) from internet connection point (see Plan) to new data ports (internet server and final connection provided by NOLS) e. install new light switch for two remaining ceiling fixtures (the third fixture will now be located in the new hallway) 7. Staff Workroom a. Install data ports (x4) for workstations b. Install data ports (x2) for check-in stations c. Install network cables from internet connection point (see Plan) to new workroom data ports (internet server and final connection provided by NOLS) d. Upgrade or replace delivery/emergency door to west exterior - include interior panic bar, exterior handle only (no lever or latch), unlocked from outside with key 8. Storage Area a. Upgrade or replace delivery/emergency door to south exterior - include interior panic bar, exterior handle only (no lever or latch), unlocked from outside with key 9. Public Services Area a. Install data ports (x2) for checkout desk i. Provide and install utility pole for network cable and data ports as shown on Plan b. Install data ports (x2) for self-check desk c. Install data ports (x2) for public copier/printer d. Install data ports (x4) for public computers e. Install network cables from internet connection point (see Plan) to new public area data ports (internet server and final connection provided by NOLS) 10. Egress and Emergency Features a. Install panic device on front entrance, and west and south delivery/emergency exit doors b. Install ceiling or wall mounted exit signage and emergency lighting along pathway to emergency doors c. Install fire extinguishers as shown on Plan 11. Signage a. Remove existing exterior Sequim Library Sign from the Sequim Library building located at 630 North Sequim Avenue and re-install at the temporary library location Contact Brian Phillips at bphillips@nols.org or 360-417-8500 x7743, with any question

Bid Results

Library

$29,637.00

Public - County

Renovation

5

3

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
40
Bidding Soon
1,131
All Active Projects
468
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2023

January 10, 2024

img_map_placeholder

609 W Washington St, Sequim, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.