Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Tampa, Florida. Completed plans call for the renovation of a water / sewer project.
Estimated Total Project Cost: $8,000,000 Schedule: Design FY24; Construction FY25 Questions may be directed to :Jim Greiner, P.E., Contract Administration, City of Tampa, (813) 274-8598, or E-Mail jim.greiner@tampagov.net. The City of Tampa Wastewater Department desires to obtain Design-Build Services for the replacement of the Administration Building Heating, Ventilation, and Air Conditioning (HVAC) System at the Howard F. Curren Advanced Wastewater Treatment Plant (HFC AWTP) located at 2545 Guy N. Verger Boulevard. Services will be provided under a contract with negotiated fixed fees for The assessment of HVAC replacement needs, selection and evaluation of design alternatives, final design, permitting, project management, overhead, profit, development of a guaranteed maximum price with appropriate surety bonds for the construction of HVAC system replacement and associated components. Services will also include, but not be limited to, engineering investigations, site planning, cost estimating, advertising and administration of subcontracts, start-up, preparation of O&M manuals, training, and all related work required for a complete project. Background: The HFC AWTP Administration Building was originally constructed in 1992. It originally housed Treatment Plant Management offices in the eastern part of the buildings second floor and three laboratories in the western and central parts of the buildings second floor: the Main (Analytical) Lab, Industrial Waste Lab, and Bay Studies Lab. The first floor contains storage rooms, utility/mechanical rooms, and covered parking areas for vehicles. In 2014, the building underwent an interior remodeling to convert the Bay Studies Lab area and areas of the Industrial Waste Lab into office space. The remodel project only included minor changes to the buildings HVAC system and the majority of the original system remains in place. The buildings HVAC system is served by two 206- ton chillers that alternate as lead (active) and backup chillers. The existing chillers were installed in 2009. The building has one 3,000,000 BTUH (max. input) natural gas burning, heating water boiler which was installed in early 2023. Although the Administration Building has undergone rehabilitations and improvements of its HVAC system since the original construction, several of the buildings HVAC system components have reached the end of their useful life. In addition, the HVAC system has not been redesigned to support the areas that were converted from laboratory space to office space. A new HVAC system is needed to restore system reliability, improve efficiency, and meet the requirements of the current use of the building. The scope of the design-build contract will include, but not be limited to: 1. Assessment of equipment replacement needs. 2. Development and analysis of alternatives for heating, ventilation and air conditioning systems, construction sequencing, methods to minimize disruption during construction, and associated cost estimates. 3. Complete design of selected alternative. 4. Construction of selected alternative. In accordance with the Americans with Disabilities Act (ADA) and Section 286.26, Florida Statutes, persons with disabilities needing a reasonable accommodation to participate in this public hearing or meeting should contact the City of Tampas ADA Coordinator at least 48 hours prior to the proceeding. The ADA Coordinator may be contacted via phone at 813-274-3964, email at TampaADA@tampagov.net, or by submitting an ADA - Accommodations Request form available Electronically
Post-Bid
Water / Sewer
$8,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
April 15, 2024
2545 Guy N Verger Blvd, Tampa, FL
Related To This Project
Tampa, FL
Bid Date: Nov 29 2023
Tampa, FL
Bid Date: Jun 23 2020
Tampa, FL
Bid Date: Apr 03 2024
Tampa, FL
--
Tampa, FL
Bid Date: Dec 05 2023
Tampa, FL
Bid Date: Dec 01 2023
Tampa, FL
Bid Date: Nov 28 2023
Tampa, FL
Bid Date: Mar 21 2024
Tampa, FL
Bid Date: Dec 06 2023
Tampa, FL
Bid Date: Feb 28 2024
Tampa, FL
Bid Date: Jan 31 2024
Tampa, FL
Bid Date: Dec 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.