BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Tampa, Florida. Completed plans call for the renovation of a water / sewer project.

Estimated Total Project Cost: $8,000,000 Schedule: Design FY24; Construction FY25 Questions may be directed to :Jim Greiner, P.E., Contract Administration, City of Tampa, (813) 274-8598, or E-Mail jim.greiner@tampagov.net. The City of Tampa Wastewater Department desires to obtain Design-Build Services for the replacement of the Administration Building Heating, Ventilation, and Air Conditioning (HVAC) System at the Howard F. Curren Advanced Wastewater Treatment Plant (HFC AWTP) located at 2545 Guy N. Verger Boulevard. Services will be provided under a contract with negotiated fixed fees for The assessment of HVAC replacement needs, selection and evaluation of design alternatives, final design, permitting, project management, overhead, profit, development of a guaranteed maximum price with appropriate surety bonds for the construction of HVAC system replacement and associated components. Services will also include, but not be limited to, engineering investigations, site planning, cost estimating, advertising and administration of subcontracts, start-up, preparation of O&M manuals, training, and all related work required for a complete project. Background: The HFC AWTP Administration Building was originally constructed in 1992. It originally housed Treatment Plant Management offices in the eastern part of the buildings second floor and three laboratories in the western and central parts of the buildings second floor: the Main (Analytical) Lab, Industrial Waste Lab, and Bay Studies Lab. The first floor contains storage rooms, utility/mechanical rooms, and covered parking areas for vehicles. In 2014, the building underwent an interior remodeling to convert the Bay Studies Lab area and areas of the Industrial Waste Lab into office space. The remodel project only included minor changes to the buildings HVAC system and the majority of the original system remains in place. The buildings HVAC system is served by two 206- ton chillers that alternate as lead (active) and backup chillers. The existing chillers were installed in 2009. The building has one 3,000,000 BTUH (max. input) natural gas burning, heating water boiler which was installed in early 2023. Although the Administration Building has undergone rehabilitations and improvements of its HVAC system since the original construction, several of the buildings HVAC system components have reached the end of their useful life. In addition, the HVAC system has not been redesigned to support the areas that were converted from laboratory space to office space. A new HVAC system is needed to restore system reliability, improve efficiency, and meet the requirements of the current use of the building. The scope of the design-build contract will include, but not be limited to: 1. Assessment of equipment replacement needs. 2. Development and analysis of alternatives for heating, ventilation and air conditioning systems, construction sequencing, methods to minimize disruption during construction, and associated cost estimates. 3. Complete design of selected alternative. 4. Construction of selected alternative. In accordance with the Americans with Disabilities Act (ADA) and Section 286.26, Florida Statutes, persons with disabilities needing a reasonable accommodation to participate in this public hearing or meeting should contact the City of Tampas ADA Coordinator at least 48 hours prior to the proceeding. The ADA Coordinator may be contacted via phone at 813-274-3964, email at TampaADA@tampagov.net, or by submitting an ADA - Accommodations Request form available Electronically

Post-Bid

Water / Sewer

$8,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
45
Bidding Soon
1,308
All Active Projects
521
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

April 15, 2024

img_map_placeholder

2545 Guy N Verger Blvd, Tampa, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.