Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a pre-engineered storage facility in Poland, Maine. Conceptual plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.
The Town of Poland is requesting bid proposals for design/engineering of a metal shelter and concrete laydown areas to be constructed at the Poland Transfer Station. Companies submitting bids must submit them in sealed envelopes with "Transfer Station Metal Shelter and Concrete Laydown Area" clearly printed on the exterior. Proposals must include vendor's name, address, phone(s), contact person, and total cost. Bidders must observe all required state and federal laws and policies. All inquiries regarding bids should be directed to the Town Manager at (207) 998-4601; email mgarside@polandtownoffice.org. The Board of Selectpersons will consider proposals on Tuesday, December 19, 2023, at 7:00pm in the Town Office conference room. The Town of Poland reserves the right to reject any or all bids. The Town of Poland reserves the right to reject any or all bids. Poland is the recipient of an Environmental Protection Agency Grant to improve the Poland Transfer Station. The Town of Poland is soliciting proposals for the design/engineering of a metal structure that will shelter our compactors and roll off containers from the elements and additional concrete laydown areas at the Poland Transfer Station located at 1 Waste Not Drive, Poland, ME 04274. Additionally, once the design of structures is completed; Draft a site plan and present it to the Poland Planning Board for approval. Draft an RFP for construction - one for the Metal Shelter and another for the Concrete Laydown Area. The RFP would include appropriate language to address Davis-Bacon, American Iron and Steel (AIS), and Build American/Buy American (BABA) requirements. The EPA would need to review and approve the draft RFP before it was sent out to bid. Include a production schedule. The schedule should account for Transfer Station normal operating hours - Friday to Monday from 7AM to 5PM. Construction should be sequenced to allow normal operation. Closing the Transfer Station to accommodate construction will be considered, but only if other options do not work and only for a short time. Collect bids and make a recommendation to the Town. A current topographical survey in .DWG format showing all structures, drainage culverts, utilities, and asphalt is available. The Poland Transfer Station has 3 compactors that need to be sheltered - 2 municipal solid waste compactors and 1 recycling compactor. There is an existing structure that provides some shelter that the new shelter would need to attach to/stand adjacent to. The 2 municipal solid waste compactors are in line with each other while the 1 recycling compactor sits back slightly. There is a concrete pad underneath all three compactors and roll off containers that would need to be extended. 220V and 110V electric power is available. Additional concrete laydown areas would also be included. Proposals should accommodate and include: Metal Shelter. Design plans stamped by an engineer. Structure with appropriate framing and a roof that will shed rain, snow and ice. Drainage plan for runoff from the roof. There is an existing drainage system that could be tied into. An add/delete option to include roll up doors on the third side. This should include a personnel door on one of the two sides. The structure should be tall and wide enough to accommodate the roll off containers being changed out. Adequate electrical lighting in the overhead to illuminate the entire area. LED fixtures are preferred. 4 light bars over each compactor and roll off container and 4 light bars in the center. 2 light bars over each of 3 compactors. Translucent roof panels may be included to improve lighting in the shelter. 4 light switches to control lighting. These should be located near the entrance on both sides, at the door to the electrical room, and in the Transfer Station Office. 5 110V power points. 2 at the outside edge near the opening of the shelter, 2 near the compactor, and one near the door to the electrical room. The foot print will be over an existing concrete pad. Concrete walls on either side of the structure will need to constructed that are high enough to hold back the fill on the other side and strong enough to hold up the structure. There should be adequate room, approximately 4', at the edge of the structure on the inside to allow personnel to safely move, and allow room for a truck to back in and swap out roll off boxes. Extend the existing concrete pad to the current roadway. Color should match the blue of the other structures at the Transfer Station. Concrete Laydown Areas. Design plans stamped by an engineer. Expansion of existing concrete laydown areas. The concrete pad will be used to store roll off containers and will be located adjacent to existing concrete pads. Design should show how storm water will be addressed. Site visit. Bidders are encouraged to request a site visit prior to the submission of bids. A graphic showing the approximate location of the metal shelter and concrete laydown area is included. Award Amount: 27,500.00
Conceptual
Warehouse / Distribution - Pre-Engineered Storage Building
$130,000.00
Public - City
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2024
1 Waste not Dr, Poland, ME
Related To This Project
Poland, ME
Bid Date: Apr 11 2024
Poland, ME
Bid Date: Aug 29 2024
Poland, ME
--
Poland, ME
Bid Date: Oct 17 2024
Poland, ME
Bid Date: Oct 17 2024
Poland, ME
Bid Date: Jun 28 2023
Poland, ME
Bid Date: Apr 28 2023
Poland, ME
Bid Date: Apr 05 2023
Poland, ME
Bid Date: Feb 06 2019
Poland, ME
Bid Date: Sep 01 2022
Poland, ME
Bid Date: Mar 31 2022
Poland, ME
Bid Date: Mar 31 2022
East Waterboro, ME
Bid Date: Nov 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.