Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Austin, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; and sidewalk / parking lot.
Blake Manor Road from Taylor Lane to Burleson Manor Road Widen from a 2 lane undivided roadway to a 4 lane divided roadway with shoulders from Taylor Lane to Burleson Manor Rd (1.3 mi) $ 16,951,250 Roadway Capacity All TxDOT Right-of-Way ROW acquisition (FM812, FM973, RM620, FM1826, and FM1431) $ 25,187,500 Roadway Capacity 1 Rowe Lane from SH130 to Hodde Lane Improve from a 2 lane undivided roadway with no shoulders to a SAFE2 cross section that includes a 2 laned divided roadway with two-way left turn lane, shoulders and a shared use path on one side from SH130 to Hodde Lane (2.6 mi)$ 31,031,000 Roadway Capacity 1 Cameron Road East of SH130 from Pecan Street to Fuchs Grove Rd Widen from a 2 lane roadway without shoulders to a 4 lane divided roadway with a shared use path from Pecan St to Fuchs Grove Rd (2.15 mi)$ 38,788,750 Roadway Capacity 1 Arterial A construction Finish outdated 95% design, ROW and Construction for a new 4 lane divided roadway with bike lanes and sidewalks.(2.3 mi) $ 33,247,500 Roadway Capacity 3 Bee Creek Road from Lakehurst Road to Highland Boulevard Improve from a 2 lane undivided roadway with no shoulders to a SAFE2 cross section that includes a 2 laned divided roadway with two-way left turn lane, shoulders and a shared use path on one side from Lakehurst Road to Highland Boulevardy (0.9 mi) $ 16,623,750 Active Transportation 2 Howard Lane Shared Use Path Install a Shared Use Path on the south side of Howard Lane (also known as McNeil Road) from McNeil Drive to McNeil-Merriltown Road. $ 11,082,500 Roadway Capacity 4 South Pleasant Valley Road (Phase I) from City of Austin to SH45 Widen the existing 2 lane undivided roadway (Bradshaw and Turnersville Rd) to 4 lane divided roadway with a median, bike lanes and sidewalks from City of Austin to SH45. This will provide the additional funding to complete the existing 2017 Bond project currently under design (2.0 mi)$ 29,922,750 Active Transportation All Active Transportation Safety Projects (including Patterson Road sidewalk) Active Transportation Safety Projects connected to Travis County roadways, including projects for safe routes to school, sidewalks, shared use paths, bike lanes, and/or signals $ 15,112,500 Roadway Capacity 3 Pyramid Drive and O'Reilly Drive substandard roads Upgrade substandard roads including Pyramid Drive and O’Reilly Drive to County standards and add sidewalk $ 15,112,500 This project is part of the county's bond that was approved by voters. As of May 21, 2024, it is currently unknown if an engineer, construction manager, and general contractor have been contracted with the school district. Further details regarding design and construction timelines have not been released.
Conceptual
Roads / Highways
$233,060,000.00
Public - County
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2027
Multiple Locations, Austin, TX
Related To This Project
Austin, TX
Bid Date: Jul 16 2024
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jan 25 2024
Austin, TX
--
Austin, TX
Bid Date: Jan 16 2024
Austin, TX
Bid Date: Feb 29 2024
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Mar 05 2024
Austin, TX
--
Austin, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.