BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Los Angeles, California. Completed plans call for the renovation of a educational facility.

Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a Combined Bid Lump Sum contract are sought from prospective prime contractor bidders (hereafter "bidders") for the following projects: Deferred Maintenance FY 21-22 CHS A4-141 AHU-17 Replacement Project Number 6742018 Deferred Maintenance FY 21-22 CHS A2-156 AHU-20 Replacement Project Number 6742020 UNIVERSITY OF CALIFORNIA, LOS ANGELES Estimated construction cost is $850,000.00. Estimated construction cost is $1,100,000.00 PREQUALIFICATION OF PROSPECTIVE BIDDERS: The University has determined that bidders who submit bids on these projects must be prequalified. Prequalified bidders will be required to have the following California current and active contractor's license: C-20 License (Warm-Air Heating, Ventilating & Air-Conditioning) GENERAL DESCRIPTION OF WORK: University is seeking to prequalify a pool of prime contractors who, once successfully prequalified, will be the only contractors allowed to bid as prime contractors on the below-listed projects: 1. Deferred Maintenance FY 21-22 CHS A4-141 AHU-17 Replacement (#6742018): The University proposes to replace AHU-17 located on the A-floor in Mechanical Room A4-141 of CHS (approximately 527 sq. ft of space). The project will require MEP and Structural work. The proposed project will reduce maintenance cost, yield more reliable comfort for building occupants and allow for greater energy efficiency. The unit serves 50 rooms, is past its useful life and is inaccessible to maintain. The project scope includes but is not limited to demolishing existing mechanical air handler units AHU-17, AHU-88, and AHU-86 and all existing associated controls, ducts, vacuum system, hydronic piping, and (3) existing booster fans. Provision of all new ductwork, extended concrete pad; provision of (1) new Air Handling Unit and (1) Control Panel and integration with the existing BMS, new AHU testing and balancing with a report documenting all results; running conduit with control wires to respective control devices; provision of new valving and provision of a new disconnect switch and breaker for the new AHU. The project scope also includes the provision of a temporary air system while construction of the new Air Handler Unit is taking place, as specified in the construction drawings and specifications. Contractor shall conduct an air survey and report all results for the existing air handler unit prior to demo as well as an air survey for the new unit upon installation completion. The Facility will be occupied and operational during the performance of the work. Portions of the scope may require after hours, overnight work and/or weekend work. Abatement of Hazardous materials is required. Pre bid meeting note: One tap mobile +12133388477, 98670287466# US (Los Angeles) +16692192599, 98670287466# US (San Jose) Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) The University reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received. proposed project will reduce maintenance cost, yield more reliable comfort for building occupants and allow for greater energy efficiency. The unit serves 50 rooms, is past its useful life and is inaccessible to maintain. The project scope includes but is not limited to demolishing existing mechanical air handler units AHU-17, AHU-88, and AHU-86 and all existing associated controls, ducts, vacuum system, hydronic piping, and (3) existing booster fans. Provision of all new ductwork, extended concrete pad; provision of (1) new Air Handling Unit and (1) Control Panel and integration with the existing BMS, new AHU testing and balancing with a report documenting all results; running conduit with control wires to respective control devices; provision of new valving and provision of a new disconnect switch and breaker for the new AHU. The project scope also includes the provision of a temporary air system while construction of the new Air Handler Unit is taking place, as specified in the construction drawings and specifications. Contractor shall conduct an air survey and report all results for the existing air handler unit prior to demo as well as an air survey for the new unit upon installation completion. The Facility will be occupied and operational during the performance of the work. Portions of the scope may require after hours, overnight work and/or weekend work. Abatement of Hazardous materials is required. Pre bid meeting note: One tap mobile +12133388477, 98670287466# US (Los Angeles) +16692192599, 98670287466# US (San Jose) Dial by your location 1 213 338 8477 US (Los Angeles) 1 669 219 2599 US (San Jose) 1 971 247 1195 US (Portland) 1 253 215 8782 US (Tacoma) 1 346 248 7799 US (Houston) 1 602 753 0140 US (Phoenix) 1 720 928 9299 US (Denver) 1 301 715 8592 US (Washington DC) 1 312 626 6799 US (Chicago) 1 470 250 9358 US (Atlanta) 1 646 558 8656 US (New York) 1 651 372 8299 US (Minnesota) 1 786 635 1003 US (Miami) The University reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received.

Post-Bid

Educational

$850,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
216
Bidding Soon
3,601
All Active Projects
1,678
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 28, 2023

December 28, 2023

img_map_placeholder

To Be Determined, Los Angeles, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.