BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Baytown, Texas. Completed plans call for the renovation of a water / sewer project.

Items or services: Recondition one 3,000 HP electric motor (P-207) used on industrial size water pumps. Work includes furnishing labor, equipment, and materials to remove, transport motor to and from contractor's facility, recondition test per CWA specifications, and re-install at CWA's Lynchburg Pump Station, 908 Independence Parkway-N, Baytown, TX 77520. Contractor shall repair/recondition a 3,000 horsepower National Oil Varco induction motor used in powering an industrial-size Vertical Centrifugal Water Pump, complete and operational per the Contract Documents (including these Technical Specifications). The specific motor is designated as Motor P-207. 1.2 Project Location: Coastal Water Authority's Lynchburg Pump Station, 908 Independence Parkway North, Baytown, Texas 77520. 2.0 SCOPE OF WORK - BID ITEM (s) 2.1 BID ITEM - 1: This Is a lump sum price to provide all, labor, cranes, tools, supplies, equipment, materials, transportation, supervision, permits, and other Work to remove, transport, disassemble, test, repair, recondition, assemble, paint, return transport, and reinstall Motor P-207 complete, field test, commissioning, and operational per the Contract Documents (including these Technical Specifications). 2.2 BID ITEM - 2: This is a unit price to provide and install two (2) bearings specified in paragraph 7.3 of Technical Specifications. 2.3 BID ITEM - 3: This is a unit price to provide and install eight (8) heaters specified in paragraph 7.4 of Technical Specifications. 2.4 BID ITEM - 4: This is a lump sum price to provide and install five (5) RTDs and a vibration switch specified in paragraph 7.5 of Technical Specifications. 2.5 BID ITEM -5: This is a lump sum price to strip and rewind and VPI treat motor P-207 per paragraph 7.6 of the Technical Specifications. CWA may elect not to have work performed based on the test results. 2.6 BID ITEM -6: This is a lump sum price to rewind the copper rotor bars per paragraph 7.7 of the Technical Specifications. CWA may elect not to have work performed based on the test results.

Post-Bid

Water / Sewer

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
52
Bidding Soon
2,654
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

December 28, 2023

img_map_placeholder

908 Independence Pkwy N, Baytown, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.