BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Mesa, Arizona. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of March 12, 2024 bids received were rejected. No definite date for the rebid. Reconstruct Broadway Road starting from Lesueur on the west to Spur Street on the east. Reconstruction includes full depth pavement reconstruction, new concrete curb and gutter, new concrete sidewalk, new ADA ramps and driveways up to the R/W throughout the corridor Reconstruct the Stapley Drive intersection with Broadway Road with added right turn lanes on all four approaches New traffic signal equipment on Broadway Road at the intersections of Horne, Solomon, and Stapley Drive New Pedestrian Hybrid Beacon (PHB) signals on Broadway Road at the intersections of Lesueur, Olive, and Temple Street New pavement marking and signing within the limits of roadway reconstruction New street lighting and conduit within the limits of roadway reconstruction New transit facility improvements New landscape and irrigation improvements Associated storm drain improvements including a new storm drain in Stapley Drive between Broadway Road and 8th Avenue Transmission and distribution water line replacement High pressure and intermediate pressure City gas line replacements Underground conversion of existing City 12kV facilities on Broadway Road from Lesueur to Horne Private irrigation relocation, as needed SRP Irrigation Improvements on Broadway Road at the intersections of Stapley Drive and Horne The City reserves the right to accept or reject any and all Statements of Qualifications. The City is an equal opportunity employer. Statement of Qualifications must include the following information The City of Mesa reserves the right to reject any or all SOQ's, to waive any informality or irregularity in any SOQ received, and to be the sole judge of the merits of the respective SOQ's received. The estimated construction cost is $40,000,000-$45,000,000. The City anticipates starting construction at the beginning of 2025. The City anticipates completing the construction in the Winter / Spring of 2027. Questions pertaining to the Construction Manager at Risk selection process or contract issues should be directed to Stephanie Delgado of the Engineering Department at Stephanie.Delgado@mesaaz.gov.

Final Planning

Roads / Highways

$45,000,000.00

Public - City

Paving, Site Work

364

5

61

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
22
Bidding Soon
714
All Active Projects
291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.