Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a clubhouse / community center.
Resurfacing the entire track at J. Thomas Lovell Jr. Community Center using the product Mondo Sport Flex. Material needs to be the 6 mm Sport Flex in the color P18 medium blue. Material will be provided by the contractor within the set deadlines. Transition will need to be included where the weight room floor meets the track. Track will also have 2-inch-wide painted running lanes. Each lane will have a desired text to be painted on. "Walk", "Jog", "Run" will need to be painted in the lane of staff's choosing. The City of Lee's Summit (the "City") is issuing this Request for Proposals( "RFP") seeking proposals ("Proposals") from qualified, licensed firms ("Contractors") interested in providing replacement of the track surface (the "Service"). The City of Lee Summit reserves the right to amend the solicitation schedule as necessary. Final Date and Time for Inquiries: February 16, 2024 10:00am Transition will need to be included where the weight room floor meets the track and where the personal training room floor meets the track. Track will also have 2-inch-wide painted lines creating 3 running lanes. Each lane will have a desired text to be painted on. "Walk", "Jog", "Run" will need to be painted in the lane of staff's choosing. J. Thomas Lovell Jr. Community Center must remain in operation during the demo and installation of the new track with the exception of the work area. The work area needs to be clearly marked to secure this area from patrons. Work areas/closures around stair access and elevator access should be as minimal as possible and only have one of those areas closed at any given time during facility operating hours. Vendor will be responsible for making sure no dust and debris will gather on the basketball court below and in the surrounding area. Vendor will have access to our elevator to move materials to and from the work site. Proposals in all areas should be responsive to ADA accessibility guidelines. The work shall consist of furnishing all labor, materials, equipment, supplies, accessories, and any associated costs needed to complete the work as proposed by the respondent. Contractor is responsible for removal of all material including the demolished track. This includes the cost of the vendor bringing in their own disposal bin if necessary. Contractor will be responsible for cleaning of work area after project is completed. Resurfacing is completed in a timely and efficient manner. Project is held to Lee's Summit Parks and Recreation standards and will be signed off when completed. Work should be performed during operational hours of the facility. Monday - Friday 5 a.m. to 10 p.m.
Award
Playgrounds / Parks / Athletic Fields
$81,200.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 21, 2024
March 22, 2024
901 Bluestem, Lees Summit, MO
Related To This Project
Lees Summit, MO
Bid Date: Dec 20 2023
Lees Summit, MO
Bid Date: Dec 20 2023
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Jan 25 2024
Lees Summit, MO
Bid Date: Jan 19 2024
Lees Summit, MO
Bid Date: Jan 30 2024
Lees Summit, MO
Bid Date: Feb 01 2024
Lees Summit, MO
Bid Date: Feb 16 2024
Lees Summit, MO
Bid Date: Dec 01 2023
Lees Summit, MO
Bid Date: Nov 15 2023
Lees Summit, MO
Bid Date: Jul 30 2019
Lees Summit, MO
Bid Date: Nov 09 2023
Lees Summit, MO
Bid Date: Dec 14 2023
Lees Summit, MO
--
Lees Summit, MO
Bid Date: Nov 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.