BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Lees Summit, Missouri. Completed plans call for site work for a clubhouse / community center.

Resurfacing the entire track at J. Thomas Lovell Jr. Community Center using the product Mondo Sport Flex. Material needs to be the 6 mm Sport Flex in the color P18 medium blue. Material will be provided by the contractor within the set deadlines. Transition will need to be included where the weight room floor meets the track. Track will also have 2-inch-wide painted running lanes. Each lane will have a desired text to be painted on. "Walk", "Jog", "Run" will need to be painted in the lane of staff's choosing. The City of Lee's Summit (the "City") is issuing this Request for Proposals( "RFP") seeking proposals ("Proposals") from qualified, licensed firms ("Contractors") interested in providing replacement of the track surface (the "Service"). The City of Lee Summit reserves the right to amend the solicitation schedule as necessary. Final Date and Time for Inquiries: February 16, 2024 10:00am Transition will need to be included where the weight room floor meets the track and where the personal training room floor meets the track. Track will also have 2-inch-wide painted lines creating 3 running lanes. Each lane will have a desired text to be painted on. "Walk", "Jog", "Run" will need to be painted in the lane of staff's choosing. J. Thomas Lovell Jr. Community Center must remain in operation during the demo and installation of the new track with the exception of the work area. The work area needs to be clearly marked to secure this area from patrons. Work areas/closures around stair access and elevator access should be as minimal as possible and only have one of those areas closed at any given time during facility operating hours. Vendor will be responsible for making sure no dust and debris will gather on the basketball court below and in the surrounding area. Vendor will have access to our elevator to move materials to and from the work site. Proposals in all areas should be responsive to ADA accessibility guidelines. The work shall consist of furnishing all labor, materials, equipment, supplies, accessories, and any associated costs needed to complete the work as proposed by the respondent. Contractor is responsible for removal of all material including the demolished track. This includes the cost of the vendor bringing in their own disposal bin if necessary. Contractor will be responsible for cleaning of work area after project is completed. Resurfacing is completed in a timely and efficient manner. Project is held to Lee's Summit Parks and Recreation standards and will be signed off when completed. Work should be performed during operational hours of the facility. Monday - Friday 5 a.m. to 10 p.m.

Award

Playgrounds / Parks / Athletic Fields

$81,200.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
29
Bidding Soon
689
All Active Projects
292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2024

March 22, 2024

img_map_placeholder

901 Bluestem, Lees Summit, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.