BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a bridge / tunnel in Brimfield Township, Ohio. Completed plans call for site work for a bridge / tunnel.

This project consists of replacing an 84'' CMP Culvert with 8'X5' Concrete Box Culvert and replacing and disturbed pavement on Cline Road. Furnishing all labor, materials and Equipment necessary to complete the project known as the 2023 cline road culvert replacement project, Specifications and Bidding Forms are on file at the office of the BRIMFIELD Fiscal Office, 4121 State Route 43, Brimfield, Ohio 44240, and Portage County Engineer's Office at 5000 Newton Falls Road, Ravenna, Ohio 44266. Engineers estimate of cost for this improvement is $228,526.92 No responsibility is assumed by BRIMFIELD Township for documents received too late for filing a bid. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in bond form, shall be issued by a surety company or corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than JUNE 30TH, 2024. Contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor s Executive Order of 1972, and Governor s Executive Order 84-9 shall be required. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services and labor in the implementation of this project. Bidders must comply with the prevailing wage rates on public improvements in Portage County and the Portage County Engineer as determined by the Ohio Bureau of Employment Services, Wage and Hour Division, (614) 644-2239. The BRIMFIELD Township Board of Trustees reserve the right to waive irregularities and to reject any or all bids.

Post-Bid

Bridges / Tunnels

$228,527.00

Public - City

Site Work

16

5

2

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
94
Bidding Soon
1,124
All Active Projects
426
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2023

January 12, 2024

img_map_placeholder

Cline Rd, Brimfield Township, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.