BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2024 at 7:00 PM

Updated January 29, 2024

Remodeling of a mixed-use development in Flint, Michigan. Completed plans call for the remodel of a educational facility.

DCC Construction is requesting bid proposals on behalf of Kearsley Community Schools for the additions and renovations work involved in creating secure entrances for Armstrong Middle School, Weston Elementary, and Fiedler Elementary. The scope of work will include (but not limited to) the following: (These are not the Bid Categories) Selective Demo Concrete, Masonry ,Structural Steel ,Roofing, Doors/Frames/ Hardware, Glass/Glazing & Storefront ,Painting ,Flooring ,Finishes, Casework, Plumbing, HVAC, Electrical. Construction Timeline - This work will begin in May of 2024 and all work will have to be completed in August 2024. Bidders or Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make such written request via email to bids@dccconstruction.com using the form supplied no later than November 22nd 2023 Progress Cleanup is required every day at a minimum or as directed by DCC Construction. Cleanup includes putting away and properly storing all tools and equipment, rolling up extension cords, properly covering and storing materials waiting for installation. All garbage/dunnage/shipping materials and associated debris generated by installations is to be properly disposed within the provided dumpsters. At no time will shipping containers, crates, materials, piles of debris, tarps, boxes, etc. be left on site, unattended and unsecured, subject to unsafe conditions. Each Trade Contractor shall ensure that every work area is properly clean, organized, and safe every night. Cleanup is to be a part of the daily routine for every trade working onsite. If contractors do not maintain their work areas or provide the proper resources for our daily clean-up, DCC Construction will provide a warning to the contractor. If the problem continues after the warning, DCC Construction will provide labor and charge all costs accordingly.

Award

Educational

$749,830.00

Public - County

Remodeling

114

25

4

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
110
Bidding Soon
2,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

May 15, 2024

Project location map

Multiple Locations, Flint, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.