BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a playground / park / athletic field in Monticello, Illinois. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Construct a new approximately 5,000 square foot pre-engineered building at Allerton Park. The project scope of work will include new building construction consisting of, at minimum, civil, site and utility work, structural, mechanical, electrical, and plumbing work associated with the new facility. Building spaces will include office space, a shop space, break room, restrooms, a garage, and a mezzanine space for mechanical equipment. Each Single Prime Bidder shall identify the total sum of their base bid and each alternate if any, as well as the breakdown of this bid by each bid / alternate(s) if any, for Work the Single Prime Bidder will perform as well as the Work performed by Protected Subcontractors for all of the following trades: (1) plumbing, (2) heating, piping, refrigeration and automatic temperature control systems, including the testing and balancing of those systems; (3) ventilating and distribution systems for conditioned air, including the testing and balancing of those systems; (4) electric wiring; and (5) general contract work . The breakdown of the Single Prime and Protected Subcontractor base bids and each alternate(s) if any, should add up to the Single Prime total base bid and each alternate totals. The following certification is applicable for contractors and subcontractors only. Pursuant to the Prevailing Wage Act, Vendor shall pay a wage of no less than the general prevailing hourly rate as paid for work of a similar character in the locality in which the work is performed, to all laborers, workers and mechanics, pursuant to definitions, guidelines and procedures set forth in 820 ILCS 130/0.01 et. seq. (2010). The Owner reserves the right to reject any or all bids or any part thereof, to waive any informalities in the bidding, and to accept the bids deemed to be in the best interests of the Owner after all bids have been examined and evaluated. Alternates, if considered, will be accepted in any order as determined by the Owner.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,317,500.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
34
Bidding Soon
435
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 22, 2024

img_map_placeholder

515 Old Timber Rd, Monticello, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.