BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Oklahoma City, Oklahoma. Conceptual plans call for site work for a water / sewer project.

Replace Spill Bucket Oklahoma City VA Health Care System (OKC VA HCS) Statement of Work (SOW) (This is for information ONLY) IMPORTANT NOTE: This Sources Sought is for market research purposes only (to determine the socioeconomic status of interested companies). No award will be made off of this posting. GENERAL: This project is to replace leaking spill bucket at the OKC VA HCS in Oklahoma City, Oklahoma. The contractor is fully responsible for verifying and validating all information contained within this statement of work. Contractor must fully evaluate the condition of the existing structures and verify the current condition of the project site. All measurements/quantities provided in this document are approximate and are to be used for reference only. The contractor will be responsible for taking on-site measurements and verifying all quantities and distances. All materials/fasteners/etc. must be new and provided by the contractor unless otherwise specified. The contractor shall abide by all Safety, Security and Infection Control Policies and Procedures of the Oklahoma City VA HCS. VA facilities are tobacco free. No smoking is permitted on VA property. The contractor is responsible for their subcontractor s compliance with this policy. All work must conform to, and comply with, the latest edition/version of ALL applicable VA, federal, state, and local laws, rules, regulations, codes, and standards. JUSTIFICATION: Spill containment inside existing hand-hole for diesel connection failed test conducted by the Oklahoma Corporation Commission for Non-compliance-Underground Storage Tank on August 11, 2023 with a follow-up date of September 12, 2023. Discrepancy must be corrected as soon as possible. STATEMENT OF WORK: The contractor shall provide supervision, manpower, and materials to properly remove existing spill bucket and replace with new. Contractor shall extract any liquid prior to removal of existing spill bucket. Contractor shall make cut no more than a 4 x 4 area of concrete to remove existing spill bucket. Contractor shall properly dispose materials generated by the excavation of the spill bucket. Contractor shall install new single-wall spill bucket to properly fit and seal existing pipe to prevent leakage along with concrete to secure spill bucket. Concrete shall match existing elevation. Clean up area after project completion and contact COR for final inspection. PHOTO REFERENCES: Existing Spill Bucket Work Schedule Normal working hours are from 7:30 AM to 4:30 PM (local time) Monday through Friday except for weekends and established Federal Holidays. New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in November Veteran s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 IMPORTANT NOTE: This Sources Sought is for information only (to determine the socioeconomic status of interested companies). No award will be made off of this posting. LIMITATIONS OF SUBCONTRACTING: The Limitations of Subcontracting may or may not apply to a resulting solicitation from this Market Research. Vendors are advised to familiarize themselves with Federal Acquisition Regulation parts 19.505(a)(2) and 19.505(b)(1) as it pertains to subcontracting limitations. Vendors are also advised to familiarize themselves with 13 CFR 125.6 and the penalties described in this regulation. Please communicate via e-mail to Angel Waalkes at angela.waalkes@va.gov by 10:00 AM November 15, 2023, as to your company s interest and ability to perform service per this brief Scope of Work. If interested, please provide the following: Please state your company s business size as related to NAICS code 236220 As per the Limitations of Subcontracting: (see FAR 19.505) As Primary Contractor: what of Total Contract Value will you retain If using a Subcontractor: what % of Total Contract Value will go to them Please provide SAM.Gov Unique Entity ID (UEID) number Please state if you have an FSS/GSA contract that includes this service If applicable provide that FSS/GSA contract number In order for you company s information to be counted in relation to this Market Research all above questions must be answered. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Water / Sewer

$250,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
24
Bidding Soon
426
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2024

img_map_placeholder

921 NE 13th St, Oklahoma City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.