BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in La Quinta, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and for outdoor lighting for a road / highway.

The project consists of removing designated turf and plant material and sidewalk reconstruction along the parkway and street entrances at the Cactus Flower Development along the southside of Fred Waring Drive generally from Dune Palms Road to Monticello Avenue and on the east side of Dune Palms from Star Flower Trail to Fred Waring Drive. Work will also take place at the three retention basins within the Development. Additionally, on the east side of Jefferson Street south of Avenue 50 to 665 feet south of Avenue 50. Turf will be replaced with drought-tolerant landscaping and irrigation. The plant palette shall include Cresta rubble, multi-colored crushed rock, and 'Baja Cresta' boulders of varying sizes with minimal use of drought-tolerant plants and re-use of designated existing plant material. In addition, the existing perimeter wall shall be cleaned, and construction of keystone block wall at various locations. Existing lighting and electrical shall be modified and new lighting shall be furnished and installed. An additive alternate includes the construction of pickleball courts with site amenities. All project work and incidental items to complete the project shall be performed in accordance with the plans, specifications, and other provisions of the contract. All the above improvements are to be constructed in a workmanlike manner, leaving the entire project in a neat and presentable condition. Refer to Sections 3000 and 4000 for more information. This project shall be completed within 60 working days from the date specified in the Notice to Proceed. Time for the commencement and completion of the work is important and is to be of the essence of the Contract. The successful bidder should plan to order any long lead time equipment items immediately following "Notice of Award"

Award

Sidewalks / Parking Lot

$1,152,564.00

Public - City

Outdoor Lighting, Paving, Site Work

37

5

2

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
840
All Active Projects
394
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

February 2, 2024

img_map_placeholder

Multiple Locations, La Quinta, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.