BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Edwards, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Eagle County is soliciting proposals for contractors to perform the reconstruction of the Hillcrest Drive and Highway 6 intersection from an intersection into a roundabout in the West Edwards area of Eagle County, Colorado. In the long-range planning for the area of west Edwards, it was determined the intersection of Hillcrest Drive and Highway 6 should be reconstructed into a roundabout. The design and construction of the new roundabout has been permitted through a CDOT access permit, which is included as Exhibit C to this RFP (included as a separate attachment). Question Deadline 12/08/2023 , Any question, interpretation or clarification regarding this Request for Proposals (RFP) is required 7 calendar days prior to the due date. All questions regarding this proposal must be in writing to Rickie Davies, Senior Staff Engineer. Questions may be faxed to Rickie Davies at (970) 328-7185 or emailed to richard.davies@eaglecounty.us. Eagle County reserves the right, in its sole discretion, to reject any and all proposals submitted in response to this RFP, to waive or not waive informalities or irregularities in proposals received or RFP procedures. Construction is anticipated to last 5 months. April 1, 2024 to September 30, 2024. Construction Engineering Services to serves as the Consultant Access Permit Inspection Staff (CAPIS) oversee the construction of the Hillcrest Drive and Highway 6 roundabout. In the long-range planning for the area of west Edwards, it was determined the intersection of Hillcrest Drive and Highway 6 should be reconstructed into a roundabout. The design and construction of the new roundabout has been permitted through a CDOT access permit, which is included as Exhibit C to this RFP (included as a separate attachment). Design of the roundabout was completed in late 2022 by Felsburg, Holt, and Ullevig(FHU). The design includes a new three-legged roundabout and relocation of the Eagle River Water and Sanitation District Access. Construction work includes but is not limited to: Excavation Grading Traffic Control Erosion Control Removal of existing pavement & curb & gutter Removal of existing storm sewer Roadway work including subgrade, HMA paving, concrete paving, and curb & gutter Lighting installation Construction surveying Storm Sewer installation Utility relocations Signage Pavement marking Landscaping Ancillary earthwork Clean-up and demobilization

Award

Roads / Highways

$600,000.00

Public - County

Paving, Site Work

131

6

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
15
Bidding Soon
294
All Active Projects
110
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 22, 2023

April 1, 2024

September 30, 2024

img_map_placeholder

US-6 & Hillcrest Dr, Edwards, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.