Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, renovation and addition to a museum in Phoenix, Arizona. Conceptual plans call for the addition of a museum; and for the renovation of a museum.
The estimated construction cost is $6.4 million, which excludes exhibit fixture design, fabrication, and installation. CHILDRENS MUSEUM OF PHOENIX GO BOND EXPANSION PROJECT DESCRIPTION On behalf of the Childrens Museum of Phoenix, the City of Phoenix seeks to renovate and upgrade unfinished spaces in the historic Monroe School building. This building was originally constructed in 1913 and is on the National Register of Historic Places. The capital improvement project intends to develop and finish areas that comply with building codes to transition approximately 28,000 square feet of building shell space to public exhibit/event and support staff spaces. In addition to the interior spaces, the selected consultant team may be asked to consult on potential exterior programming and exhibits to existing interior areas. The preliminary project schedule targets the pre-design/design for late 2024 and construction to start the end of Summer 2025, with construction finishing the end of Spring 2026. This timeline is subject to change based on the outcome of the Pre-Design Phase. The consultant team will be responsible for general project administration, schematic design/pre-design phase (30%), design development phase (60%, 90% and 100%), commissioning, cost analysis, construction documents and specifications, and possible construction administration and observation. City Rights. The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Museum
$6,400,000.00
Public - City
Addition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
215 N 7th St, Phoenix, AZ
Related To This Project
Phoenix, AZ
--
Phoenix, AZ
--
Phoenix, AZ
Bid Date: Nov 30 2023
Phoenix, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.