BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Antis Township, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

As of January 5, 2024, the project has not been awarded. A timeline for award has not been confirmed. This Project is for the Construction of a Multi-use Trail That Will Extend From Becker Road in Antis Township to the Sr 865 Overpass in Bellwood. Two Sections of Trail Will Be Constructed. The First Section Includes Approximately 1,960 Linear Feet of New Trail From Becker Road to the Existing Pedestrian Bridge Over Norfolk Southern Railroad and Includes a New Bridge Over Bells Gap Run. The Second Section Includes Approximately 1,540 Linear Feet of Share the Road and Designated Trail From the Southern Terminus to the Existing Pedestrian Bridge Over Norfolk Southern Railroad to a New Trail Head Adjacent to the Sr 865 Bridge. This Project is to Be Built as Indicated on the Approved Drawings Included in the Bid Package for State Route 0000 Section Lvs in Blair County, Antis Township and Bellwood Borough at the Locations Indicated on the Plans in the Bid Package. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 32.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Logan Valley Streetcar Trail, Phase 1 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$1,836,836.00

Public - State/Provincial

New Construction, Paving, Site Work

125

7

4

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
24
Bidding Soon
467
All Active Projects
172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

March 11, 2024

img_map_placeholder

To Be Determined, Antis Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.