BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work and paving for a civil project in Ottawa, Ontario. Design plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The project involves the integrated renewal of the road infrastructure, sewers, and watermains on Anna Avenue from Carling Avenue to General Avenue and on Crown Avenue from Tunis Avenue to General Avenue. The scope of this project includes: New sanitary sewers on Anna Avenue between Carling Avenue and General Avenue intersection (approx. 450m). Remove and replace the sanitary sewer and all existing lateral services to the property limits. New sanitary sewers on Crown Crescent from Anna/Tunis to Anna/General intersections (approx. 200m). Remove and replace the sanitary sewer and all existing lateral services to the property limits. New watermain on Anna Avenue between Carling Avenue and General Avenue (approx. 450m). Remove and replace the watermain and all existing services to the property limits. New watermain on Crown Cres from Anna/Tunis to Anna/General intersections (approx. 250m). Remove and replace the watermain and all existing services to the property limits. A section of new watermain at Anna Avenue and Carling Avenue; extend the watermain 50m east on Carling Ave for looping. Remove and replace the watermain and all existing services to the property limits. A segment of new storm sewer on Crown Crescent (approx. 27m). Remove and replace storm sewer and all existing laterals services to the property limits. All other storm sewers in the project limits are in good condition and are to be protected during construction unless the that they cannot be. and #22 / #18 Viscount Ave. Consultant determines Abandon sanitary sewer in an existing easement located between properties #22 / #38 Anna Ave o Design and implement full road reconstruction including sidewalks and curbs (where applicable) on Anna Avenue between Carling Avenue and General Avenue. Implement full road reconstruction including sidewalks and curbs (where applicable) on Crown Crescent between Anna/Tunis and Anna / General intersections. TIMELINE: Engineering design is ongoing through to the end of 2025. A public Information Centre occurred April 15, 2025. Construction is planned for spring 2026, pending funding & owner's decision to proceed. Approved project funds to date are $1 million.

Design

Water / Sewer

$10,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
85
Bidding Soon
1,169
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2026

Project location map

Multiple Locations, Ottawa, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.