BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lebanon, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Description of Work: the Elizaville Road Drainage Project Consists of Inlets, Storm Sewer, Minor Grading, and Associated Pavement and Driveway Repairs in the 2000 Block of Elizaville Road Between Grant Blvd. And Winding Way. The Project Consists of 12-inch, 15-inch and 18-inch Hp Storm Pipe. The Storm Sewer is Located Along the North Side of Elizaville Rd. Within Easements and Existing Right-of-way. There Are Multiple Inlets on the South Side of Elizaville Road. The System Continues West, Then North Within an Easement and Outlets in the Prairie Creek New Reynolds Ditch. Please Direct All Questions Regarding This Project to Kevin Krulik, City of Lebanon, Indiana, Department of Engineering, 401 S. Meridian Street, Lebanon, in 46052, (765) 482-8845, Kkrulik@lebanon.in.gov Security: Each Bid Shall Be Accompanied by an Acceptable Bid Bond in the Amount Equal to 5 Percent of the Total Bonds: the Contractors to Whom Work is Awarded Shall Be Required to Furnish a Performance Bond and a Payment Bond, Each in the Amount of One Hundred Percent (100%) of the Contract Price, and They Shall Be Acceptable to the Owner. Qualification of Bidders: Bidder and Bidder s Sub-contractors Performing Work Type, Must Be on the Most Current Indiana Department of Transportation Pre-qualified Contractors List at the Date of the Bid Opening for the Types of Work Involved With This Project, Including, but Not Limited to Bituminous Paving, Traffic Control, Ada Compliant Sidewalks and Ramps, Storm Sewer Casting Adjustments, Sanitary and Miscellaneous Concrete. The Owner Reserves the Right to Retain the Three Lowest Bid Proposals for a Period of Not More Than Ninety (90) Days, and Said Proposal Shall Remain in Full Force and Effect During Said Time. Tree removal is the responsibility of the contractor. Tree removal is expected to follow the INDOT Active Bat Season Tree Removal Policy. It is assumed tree removal will be done prior to March 31, 2024.

Bid Results

Water / Sewer

$240,295.00

Public - City

Paving, Site Work

36

8

7

8

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
38
Bidding Soon
767
All Active Projects
303
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

January 10, 2024

img_map_placeholder

Elizaville Rd, Lebanon, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.