Published February 3, 2024 at 7:00 PM
Updated February 4, 2024
Site work and paving for a road / highway in Morgantown, West Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Board of Park and Recreation Commissioners is requesting sealed bids from qualified contractors to create a walking trail at Paul Preserve Park. SCOPE OF WORK shall include all labor, materials, equipment, and transportation to complete the renovation. BOPARC reserves the right to reject any and all bids in whole or in part, as their interest may require; and to waive any informality in bids received. Additionally, BOPARC reserves the right to accept or reject a Bid not accompanied by the required Bidding Documents to accept or reject any condition of the Bid by a Bidder that is in any way inconsistent with the terms and conditions of the Bidding Documents or to accept or reject a Bid that is in any way incomplete or irregular. Bidders and any subcontractors must be in possession of a current WV State Contractors License. Other local licensing and permits required and are listed within the complete bid packet. #1 - MOBILIZATION/DEMOBILIZATION Mobilization/Demobilization will be paid for by the Lump Sum (LS) Unit bid cost. The cost for this item shall not exceed 5% of the total project bid. #2 - TOPSOIL, STRIP AND STOCKPILE, ASSUME 6" DEPTH Topsoil, Strip and Stockpile, Assume 6" Depth will be paid for by the Cubic Yard (CY) unit bid price and shall include stripping, stockpiling, and erosion control. Quantity is for informational purposes only and is based on an estimated 6" depth. The Contractor shall be responsible for stripping topsoil and stockpiling topsoil regardless of the actual depth and all payment will be held strictly to the estimated yardage with no increase or reduction in quantity. Contractor should also account for any double handling in the unit bid cost. This item includes installation and removal of a 12" compost filter sock along the downstream perimeter of the topsoil stockpile. #3 - EXCAVATION, CUT TO FILL Excavation, Cut to Fill will be paid for by the Cubic Yard (CY) Unit bid price. All earthwork is unclassified. No additional payment will be made for rock excavation. Price shall include the excavation of trail and complete preparation as necessary to accomplish the purpose of these plans including, cut, fill, placement, compaction, and testing. Earthwork quantity is for informational purposes only and will be paid strictly to the CY estimate with no increase or reduction in quantity. The Contractor shall be responsible for completing the full scope of the project within this bid quantity. This item includes the preparation of the subgrade for the trail. Subgrade shall follow the lines and grades of finished ground and compacted and tested as per WVDOH standards and specifications. Subgrade shall be within the tolerance of 3/4 ". Unsuitable, excavated material not used in the cut/fill operations shall be removed from the site and shall be considered incidental to this pay item. #4 - RETAINING WALL Retaining Wall will be paid for by the SF of face of wall. Face of wall is defined as the base blocks, intermediate blocks, and the wall cap. This item includes all excavation, base preparation and base, base and foundation blocks, stone aggregate backfill, geogrid layers, drainage and all materials and labor necessary for the completion of this item. The wall system shall be Stone Strong systems or approved equal and be installed as per Stone Strong Systems standard details and specifications
Bid Results
Roads / Highways
$55,889.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 30, 2024
February 29, 2024
To Be Determined, Morgantown, WV
Related To This Project
Morgantown, WV
Bid Date: Dec 04 2023
Morgantown, WV
Bid Date: Mar 19 2021
Morgantown, WV
Bid Date: Feb 26 2019
Morgantown, WV
Bid Date: Jan 17 2024
Morgantown, WV
Bid Date: Dec 29 2023
Morgantown, WV
Bid Date: Jan 09 2024
Morgantown, WV
Bid Date: Jan 25 2024
Morgantown, WV
--
Morgantown, WV
--
Morgantown, WV
--
Morgantown, WV
Bid Date: Dec 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.