EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 29, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a military facility in Saint Inigoes, Maryland. Completed plans call for the renovation of a military facility.

The purpose of this project is to completely renovate and reconfigure approximately 10,000 sf within the existing 12,463 sf building. This includes updates/renovations to mechanical, plumbing, electrical, lighting, life safety, and communication. An optional component of this work will include Furniture, Fixtures, and Equipment (FF&E). N4008022F4021 13148774, 1700018 ***This solicitation is restricted to the seven (7) vendors participating in the U.S. Navy, NAVFAC Washington, $750M 8(a) .*** Estimated Budget Amount or Price Range: In accordance with FAR 36.204, Disclosure of the of Construction , the estimated price range for this project is between $1,000,000 and $5,000,000. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government requires completion of construction within 285 calendar after (includes 15 calendar for and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number: MD20230055 10/20/2023 applies to this work. Should this wage determination be modified by DoL prior to , the most current wage determination will be incorporated at the time of . Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages - Construction, Liquidated Damages will be assessed in the amount of $1,117.00 for each calendar day of delay. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility , the Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia. Bond Requirements: Bonds are required in accordance with FAR 28.101-4 (for over $150,000). An electonic copy of your must be submitted with your proposal. A hard copy of your will be requested from the apparent low uplon confimration of their price and must be submitted to the PCO office within one (1) buisness day from time of request. Failure to submit an electronic copy of your with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration. In accordance with FAR 52.228-15 and Payment - Construction, andThe purpose of this project is to completely renovate and reconfigure approximately 10,000 sf within the existing 12,463 sf building. This includes updates/renovations to mechanical, plumbing, electrical, lighting, life safety, and communication. An optional component of this work will include Furniture, Fixtures, and Equipment (FF&E). ***This solicitation is restricted to the seven (7) vendors participating in the U.S. Navy, NAVFAC Washington, $750M 8(a) .*** Estimated Budget Amount or Price Range: In accordance with FAR 36.204, Disclosure of the of Construction , the estimated price range for this project is between $1,000,000 and $5,000,000. Time for Completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and Completion of Work, the Government requires completion of construction within 285 calendar after (includes 15 calendar for and approval of bonds and insurance). Wage Determination: Department of Labor (DoL) General Decision Number: MD20230055 10/20/2023 applies to this work. Should this wage determination be modified by DoL prior to , the most current wage determination will be incorporated at the time of . Liquidated Damages: In accordance with FAR 52.211-12 Liquidated Damages - Construction, Liquidated Damages will be assessed in the amount of $1,117.00 for each calendar day of delay. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility , the Contractor, at its expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of each utility used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia. Bond Requirements: Bonds are required in accordance with FAR 28.101-4 (for over $150,000). An electonic copy of your must be submitted with your proposal. A hard copy of your will be requested from the apparent low uplon confimration of their price and must be submitted to the PCO office within one (1) buisness day from time of request. Failure to submit an electronic copy of your with your proposal will result in your proposal being deemed non-responsive and your proposal removed from consideration. In accordance with FAR 52.228-15 and Payment - Construction, and Payment Bonds are required from the awardee and shall be submitted for approval to the Contracting Officer within 10 after of the Task Order. Commencement of construction is contingent upon approval of required bonds. Proposal Acceptance Period: Proposal acceptance period shall be 120 from receipt of offers. Request for Information (RFIs): All inquiries must be made in writing and shall be submitted via to William S. Bryan, William.s.bryan6.civ@us.navy.mil no later than 1 DEC 23 by 1500 local time with inquiries included in an Excel spreadsheet (no tables please). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an . Payment Bonds are required from the awardee and shall be submitted for approval to the Contracting Officer within 10 after of the Task Order. Commencement of construction is contingent upon approval of required bonds. Proposal Acceptance Period: Proposal acceptance period shall be 120 from receipt of offers. Request for Information (RFIs): All inquiries must be made in writing and shall be submitted via to William S. Bryan, William.s.bryan6.civ@us.navy.mil no later than 1 DEC 23 by 1500 local time with inquiries included in an Excel spreadsheet (no tables please). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$5,000,000.00

Public - Federal

Renovation

1

52

9

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, Quality Assurance, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber, Plastic Fabrications, Solid Surfacing Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Aluminum Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Static-Control Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Corner Guards, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Exterior Specialties, Protective Covers, Other Specialties, Pest Control Devices, Scales
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Rugs, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Special Activity Rooms, Saunas
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Cooling Equipment, Cooling Towers, Liquid Coolers, Central HVAC Equipment, Evaporative Air-Cooling Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Clamps, Hooks, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
75
Bidding Soon
1,699
All Active Projects
761
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 28, 2023

February 26, 2024

img_map_placeholder

St Inigoes Rd, Saint Inigoes, MD


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Building 8222 Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.