BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 19, 2024 at 7:00 PM

Updated January 29, 2024

Demolition, site work, renovation and addition to a bridge / tunnel in Berea, Ohio. Completed plans call for site work for a bridge / tunnel; for the addition of a bridge / tunnel; for the renovation of a bridge / tunnel; and for the demolition of a bridge / tunnel.

As of December 28, 2023, this project has not yet been awarded. A timeline for award has not yet been established. All questions during bidding shall be submitted no later than 4:00 p.m. on December 8, 2023. Barrett Road Conveyance Bridge Replacement 2024 Each bidder is required to furnish with the proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety.

Award

Bridges / Tunnels

$319,885.00

Public - City

Addition, Demolition, Renovation, Site Work

19

14

8

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
95
Bidding Soon
2,071
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2023

January 15, 2024

Project location map

Barrett Rd, Berea, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.