BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving, asbestos abatement, outdoor lighting and new construction of a mixed-use development in Bell Gardens, California. Completed plans call for the demolition of a 13,113-square-foot, one-story above grade playground / park / athletic field; for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; for asbestos abatement for a playground / park / athletic field; swimming pool; swimming pool; swimming pool; swimming pool; swimming pool; swimming pool; water / sewer project; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

1. CONTRACTOR shall provide all labor, materials, equipment and incidentals as specified and required for demolition, removal and disposal. 2. Included, but not limited to, are demolition and removals of existing materials, equipment, as shown and specified, and to connect same with existing work in an approved manner. Demolition includes structural concrete, foundations, walls, doors, windows, structural steel, metals, roofs, masonry, attachments, appurtenances, piping, electrical and mechanical equipment, paving, curbs, walks, fencing, , brush, rubbish, scrap, and similar existing facilities. The CONTRACTOR shall also be responsible for the removal of hazardous materials including asbestos and lead based paint as specified in these specifications. 3. Demolition and removals which may be specified under other Sections shall conform to requirements of this Section. A. Demolition Procedures: Submit to the City Engineer for approval proposed methods, equipment, and operating sequences. B. Demolition Schedule: The CONTRACTOR shall submit a schedule to the Engineer which indicates the proposed sequence of demolition Engineering Cost Estimate: $24 - $27 million (including Furniture, Fixtures, and Equipment)

Award

Playgrounds / Parks / Athletic Fields

$26,334,000.00

Public - City

Asbestos Abatement, Demolition, New Construction, Outdoor Lighting, Paving, Site Work

189

33

65

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
105
Bidding Soon
2,265
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

March 14, 2024

img_map_placeholder

7950 Scout Ave, Bell Gardens, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.