BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Saint Ignatius, Montana. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Site Directions: The Falls Creek Diversion Rehabilitation Project - is located at the intersection of Falls Creek and the Tabor Feeder Canal in the Mission Mountains approximately 13 miles southeast of St. Ignatius, MT on the Flathead Indian Reservation, MT. A project pre-bid meeting is scheduled for Wednesday December 13, 2023, from 10 AM to noon (local time) at the Salish Kootenai Kicking Horse Complex, 33019 Quequesah Drive, Ronan, MT 59864. The pre-bid meeting is NOT mandatory, but all prospective bidders are encouraged to visit the project site at Falls Creek Diversion approximately 13 miles southeast of St. Ignatius, Montana. Travel to the site in the winter months may require a tracked UTV or similar equipment and may not be accessible via a 4x4 vehicle. Photographs and aerial UAV footage will be shared during the pre-bid meeting. Failure by bidders to inspect the site or the review the photographs and UAV footage will not relieve bidders from the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the contract documents. Project Category Code: Irrigation, Street/Road Repairs, Culverts, Waterways, Stormwater Channels, Demolition/Building Removal/Hauling/Salvage, Water Diversion Structure, Concrete/Formed/Flatwork/Foundation Description: The Confederated Salish and Kootenai Tribes desire to enter into a Construction Agreement with a general construction contractor to demolish, remove, and replace the existing Falls Creek reinforced concrete structure, install new control gates, and a concrete measurement flume downstream on the Tabor Feeder Canal; remove the existing bridge over Falls Creek and replace with a concrete box culvert; and make improvements to the access road to the project site to facilitate the mobilization of construction equipment and materials. Estimated cost range of project: From $2,000,000 to $2,500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$2,414,460.00

Public - Federal

Site Work

37

20

49

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
5
Bidding Soon
66
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Saint Ignatius, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.