BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Omak, Washington. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The work includes, but is not limited to, the following: 1. Construct new filtration building. 2. Furnish and install pyrolusite filtration system, raw water piping, finished water piping, backwash drain system including interior piping, and other supporting appurtenances. 3. Construct new concrete backwash storage reservoir and supporting appurtenances. 4. Construct site improvements to include site piping, concrete pad, fencing, and gravel surfacing. 5. Furnish and install new PVC sanitary pipe, manholes and appurtenances. 6. Furnish and install permanent generator. 7. Furnish and install electrical and control improvements as required for a complete and workable system. 8. Furnish roll-off dewatering container. 9. Provide testing, commissioning, and training. 10. Surface restoration of all disturbed surfaces. The Work shall be substantially complete within 180 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Omak Washington. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Omak" and in an amount of not less than five percent (5%) of the total Proposal amount. Contract questions shall be directed only to the office of the Project Engineer - David Ellis, P.E. The City of Omak is an Equal Opportunity and Affirmative Action Employer. All work performed on this project will be subject to the higher of the prevailing state or federal wage rates. This project is partially funded through the Washington State Drinking Water State Revolving Fund program with federal funds from the Environmental Protection Agency. Small, Minority- and Women-owned firms are encouraged to submit bids. The City of Omak expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. All contractors shall be licensed to conduct business in the State of Washington. All Drinking Water State Revolving Fund requirements and provisions shall be met by the general contractor and all subcontractors. The undersigned has examined the Work site(s), local conditions, the Contract, and all applicable laws and regulations covering the Work. The following unit and lump sum prices are tendered as an offer to perform the Work in accordance with all of the requirements set forth in the Contract and all applicable laws and regulations. As required by the Contract, a postal money order, certified check, cashier's check or Proposal bond made payable to the Owner is attached hereto. If this Proposal is accepted and the undersigned fail(s) or refuse(s) to enter into a contract and furnish the required performance bond, labor and material payment bond, special guarantee bonds (if required), required insurance and all other required documentation, the undersigned will forfeit to the Owner an amount equal to five percent of the Proposal amount. After the date and hour set for submitting the Proposals, no bidder may withdraw its Proposal, unless the Award of the contract is delayed for a period exceeding 60 consecutive calendar days. The undersigned agrees that in the event it is Awarded the contract for the Work, it shall employ only Contractors and Subcontractors that are duly licensed by the State of Washington and remain so at all times they are in any way involved with the Work. The undersigned agrees that the Owner reserves the right to reject any or all Proposals and to waive any minor irregularities and informalities in any Proposal. The undersigned agrees that the Owner will Award the Contract to the lowest responsible, responsive bidder whose Proposal is in the best interest of the Owner. In accordance with RCW 39.30.060, for Proposals exceeding one million dollars, failure to list subcontractors with whom the bidder, if awarded the contract, will directly subcontract for performance of the work of structural steel installation, rebar installation, heating, ventilation and air conditioning, plumbing, as described in Chapter 18.106 RCW, and electrical, as described in Chapter 19.28 RCW or naming more than one subcontractor to perform the same work will result in your bid being non-responsive and therefore void. These subcontractors must be listed below along with the work to be performed. This information must be provided with the Proposal or within one hour after the published bid submittal time for the work of heating, ventilation, air conditioning, plumbing and electrical. This information must be provided with the Proposal or within 48 hours after the published bid submittal time for the work of structural steel and rebar installation. To the extent the Project includes one or more categories of work referenced in RCW 39.30.060, and no subcontractor is listed below to perform such work, the bidder certifies that the work will either (i) be performed by the bidder itself, or (ii) be performed by a lower tier subcontractor who will not contract directly with the bidder. Subject to any extensions of the Contract Time granted under the Contract, the undersigned agrees to substantially complete the Work required under this Contract within 180 working days (the Substantial Completion Date) and to physically complete the Work required under this contract within 190 working days (the Physical Completion Date) from when Contract Time begins. The undersigned has reviewed and fully understands the provisions in the Contract regarding liquidated damages and agrees that liquidated damages shall be $1,500.00 per day for each and every working day beyond the Contract Time allowed for substantial completion until the Substantial Completion Date is achieved and $1,000.00 for each and every working day required beyond the Contract Time for physical completion until the Physical Completion Date is achieved. The undersigned is, and will remain in, full compliance with all Washington State administrative agency requirements including, but not limited to registration requirements of Washington State Department of Labor & Industries for contractors, including but not limited to requirements for bond, proof of insurance and annual registration fee. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Playgrounds / Parks / Athletic Fields

$2,278,785.00

Public - City

Site Work

44

25

6

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
11
Bidding Soon
90
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2023

February 5, 2024

img_map_placeholder

To Be Determined, Omak, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.