BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Rhinelander, Wisconsin. Contact the soliciting agency for additional information.

Snow removal at the Supervisors Office Period of : 12/05/2023 to 10/31/2024 Contractor shall provide all materials, equipment and labor to complete Snow Removal in accordance with its schedule, specifications, sketch and contract clauses/provisions contained herein. The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials (e.g., Ice Melting Products), that are environmentally preferable, with recycled content and that are recyclable, are made from bio-based materials and are energy efficient (Energy Star- qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered. REQUIREMENTS: 1. Work Schedule: Complete by 6:00 am Monday thru Friday, except on Federal Holidays, when the following conditions exist on the walking and driving surfaces: When there is Snow or Slush accumulation of 1 inch or more. When there are icy conditions that present a slipping hazard. 2. Snow Removal: Shall be completed in the following areas. Parking Lots Walking Surfaces South Patio Area HVAC System Area Garage Area Around Fire hydrant Mailbox access 3. Snow Storage: Areas are indicated on the attached site map as (no parking areas November-May). All snow and slush shall be piled in designated areas only. Snow piles shall be consolidated to conserve storage area. Piling of snow in undesignated areas, by the Service Provider will not be acceptable and shall be moved to the designated snow storage areas, upon request, by COR and at the expense of the Service Provider. 4. Ice Melt Application: Provide and Spread, Ice Melt granules on these areas after snow or slush has been removed, up to facility entrances. Sidewalks South Patio Area HVAC Area (for access) 5. Parking Lots and Driveway Sanding: Provide and Spread Sand in the Parking Lot areas after snow or slush removal to provide safe driving of vehicles and walking for pedestrians from vehicles to the facility Sidewalks.

Post-Bid

Roads / Highways

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
8
Bidding Soon
105
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

December 5, 2023

img_map_placeholder

500 Hanson Lake Rd, Rhinelander, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.