BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Vallejo, California. Contact the soliciting agency for additional information.

The District is requesting proposals for development of an effective flood safety plan and phased consttuction program to improve the Tubbs Island levee system in an effective manner within provided funding constraints. The scope of work includes the following: - Development of a flood safety plan: Plan shall identify key stakeholders and sources for acquisition of resources or equipment during a flood event; develop a flood contingency map identifying known problem areas and methodology for addressing known challenges. Prepare/execute a training exercise to familiarize District staff with the flood fighting process. - Geotechnical investigation: Conduct a geotechnical investigation to understand existing subsurface conditions; perform slope stability analysis to evaluate the proposed levee design; and provide recommendations for levee fill. Investigate suitability of Tubbs Island as a borrow site for levee improvement fill. Assume that District staff will provide the backhoe and operator to excavate test pits which can be used by the geotechnical engineer to log the pits and obtain soil samples for further visual classification and laboratory testing. Submit investigation and recommendations in a report. Design Levee Survey: Verify and supplement existing ground survey and survey control as needed for the design. The original survey was conducted by Cinquini & Passarino, Inc. in April 2020. Provide topographic ground survey of potential project borrow site. - Prepare Basis of Design Report and Plans, Specs, and Estimates: Provide Basis of Design (BOD) report outlining the approach to be used in designing and implementing the levee improvements, geotechnical investigations and survey needs. Develop construction plans and specifications for the levee improvements, with an engineer's opinion of probable construction costs. The design documents should allow for phased bidding and construction based on the CIP budget and the most cost-effective way to perform construction. Deliverables should include the BOD report, a 60% submittal, a 100% submittal, and response to comments at each submittal. Assume the District will provide front-end specifications. Environmental and Permitting Support: o Provide coordination, environmental surveys, permit preparation and acquisition, and report preparation for the proposed project. o Prepare CEQA Initial Study and resulting Notice of Exemption, Mitigated Negative Declaration, or Environmental Impact Report, as needed. Environmental work shall include making recommendations for environmental best management practices, biological monitoring and surveying during construction. - Bidding Support: Support the District during bidding and construction phases by providing letters of clarification during bidding, reviewing submittals for conformance with contract documents, and responding to RFIs. o Provide assumptions on number of submittals and RFIs to be reviewed. [OPTIONAL TASK] Levee Inspection Program: Develop and implement a levee inspection program. The levee inspection program should include a standard operating procedure (SOP) that details the frequency of inspections, inspection standards to be used, any required levee access preparation, etc. The inspections will be performed by the Consultant at the frequency recommended in the SOP. Technical and procedural inquiries shall be directed to the Vallejo Flood and Wastewater District's Engineering Department at the following email: ENGAdmin@vallejowastewater.org. All inquiries will be reviewed, additional information requests beneficial to all proposers will be answered via addendum to the RFP. Addenda shall be posted on the District's website and noticed via automated email notification. Question Deadline 12/06/2023 at 2:00 PM PT The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
84
Bidding Soon
1,901
All Active Projects
797
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

img_map_placeholder

Multiple Locations, Vallejo, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.