Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Des Moines, Iowa. Completed plans call for site work for a water / sewer project.
The Proposal shall be made out on a preprinted form furnished by the Board and must be accompanied in a separate envelope by a Bid Bond or other security ("bid security") permitted by statute. The amount of the bid security shall be ten percent (10%) of the bid submitted by the bidder. The bid security shall be made payable to the Board. The bid security must not contain any conditions either in the body or as an endorsement thereon. The bid security shall be forfeited to the Board as liquidated damages in the event the successful bidder fails or refuses to enter into a Contract within ten (10) days after the award of Contract and post bond satisfactory to the Board. The Contractor's Bond shall be in an amount equal to one hundred percent (100%) of the Contract price, be issued by a responsible surety approved by the Board, guarantee the faithful performance of the Contract and the terms and conditions therein contained, protect and save harmless the Board from claims and damages of any kind caused by the operation of the Contractor, guarantee materials and workmanship to be free of defects for a period of two (2) years from and after completion and acceptance by the Board, guarantee surface restoration work in public right-of-way to be free of defects for a period of four (4) years from and after completion and acceptance by the Board, and shall otherwise in all respects comply with the Code of Iowa. The Board reserves the right to defer acceptance of any Proposal for a period not to exceed forty-five (45) calendar days from the date of receipt of bids. A. Contract completion dates are as shown below for each street segment. Due to the proximity of the project to Howe Elementary and Meeks Middle School, two crews will be required to work simultaneously at all times until Substantial Completion of Phases 1-5. When construction has commenced on Phases 1-5, Contractor shall commit to continuing work on each phase until Substantial Completion is attained. Refer to 1.15 Project Phasing or the Plans for a detailed breakdown of phases. 1. E Pleasant View Drive - SE 5th Street to SE 7th Street a. City of Des Moines requires work to be completed during summer months due to proximity to Howe Elementary School. b. Start: June 4th or after last day of school. c. Substantial Completion: August 12th, 2024. d. Final Completion: September 30th, 2024. e. Two Crews are required at all times. 2. E Virginia Avenue - SE 7th Street to SE 8th Street a. City of Des Moines requires work to be completed during summer months due to proximity to Howe Elementary School. b. Start: June 4th or after last day of school. c. Substantial Completion: August 12th, 2024. d. Final Completion: September 30th, 2024. e. Two Crews are required at all times. 3. SE 6th Street - E Pleasant View Drive to E Park Avenue a. City of Des Moines requires work to be completed during summer months due to proximity to Weeks Middle School. b. Start: June 4th or after last day of school. c. Substantial Completion: August 12th, 2024. d. Final Completion: September 30th, 2024. e. Two Crews are required at all times. 4. SE 7 th Street - E Virginia Avenue (North) to E Pleasant View Drive a. City of Des Moines requires work to be completed during summer months due to proximity to Howe Elementary School. b. Start: June 4th or after last day of school. c. Substantial Completion: August 12th, 2024. d. Final Completion: September 30th, 2024. e. Two Crews are required at all times. 5. E Pleasant View Drive - SE 14 th Street (State Hwy 69) to 1549 E Pleasant View Drive a. Start: April 1st, 2024, or as weather allows. b. Substantial Completion: November 1st, 2024. c. Final Completion: December 15th, 2024
Award
Water / Sewer
$1,844,549.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2023
June 4, 2024
Multiple Locations, Des Moines, IA
Related To This Project
Des Moines, IA
Bid Date: Nov 20 2023
Des Moines, IA
Bid Date: Dec 12 2023
Des Moines, IA
Bid Date: Dec 05 2023
Des Moines, IA
Bid Date: Nov 30 2023
Des Moines, IA
Bid Date: Dec 25 2023
Des Moines, IA
Bid Date: Dec 04 2023
Des Moines, IA
Bid Date: Dec 07 2023
Des Moines, IA
Bid Date: Dec 19 2023
Des Moines, IA
Bid Date: Dec 01 2023
Des Moines, IA
Bid Date: Jan 09 2024
Des Moines, IA
Bid Date: Dec 05 2023
Des Moines, IA
--
Des Moines, IA
Bid Date: Nov 15 2023
Des Moines, IA
--
Des Moines, IA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.