BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a warehouse / distribution facility in Berry Mills, New Brunswick. Completed plans call for the renovation of a warehouse / distribution facility.

In general, the work consists of the partial replacement of the metal roof system of the former Administration portion of the Material Recovery Facility located on the east side of the building. The roof retrofit will also include a new conventional structural steel framing to raise the existing roof elevation to match the elevation and slope of the adjacent, existing roof to the west. The project will also include the installation of three (3) new roof hatches in the fire pump house structure. All work will be at the Material Recovery Facility at 100 Enviro Drive, Berry Mills, NB. Each Bid shall be accompanied by a Bid Bond in the amount of 10% of the Bid Price. The successful bidder will be required to provide a Labour and Materials Payment Bond, and a Performance Bond, each in the amount of 50% of the Bid Price. Bid Documents may be purchased for a cost of $75.00, plus HST, per set (in hardcopy at site office or via e-mail) from: Echelon Engineering 21 Austin Street Moncton, New Brunswick E1C 1Z7 Tel: (506) 377-5339

Post-Bid

Warehouse / Distribution

$300,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
13
Bidding Soon
158
All Active Projects
64
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

December 29, 2023

img_map_placeholder

100 Enviro Drive, Berry Mills, NB

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.