BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Windsor charter Township, Michigan. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; water / sewer project; and water / sewer project.

Lein Check (Department of Corrections Only) All Contractor / Vendor Representatives Attending Preproposal Walk Through Meeting Must Submit a Vendor / Contractor Lein Request Form Five Business Days Prior to the Meeting Date (See the Attached Vendor/contractor Lein Request Form). Send the Lein Request Form, Filled and Signed, by Email to Daniel T. Smith at Email Address: Smithd76@michigan.gov . The Email "Subject" Must Include (Facility Name, Project Name, Date and Time of Pre-proposal Walk Through Meeting). Project Description/services Requested the Steam Tunnels at the Energy Center of the State Secondary Complex Are Experiencing Water Infiltration and Have Experienced Infrastructure Damage as a Result. This Tunnel System is Responsible for Supplying Steam for Heating, Chilled Water, and Electricity for the Secondary Complex. There Are Approximately 3 Miles of Steam Tunnels, and Damage is Intermittent Throughout These Tunnels. Water Infiltration Has Occurred Primarily at Joints in the Concrete Construction, However There is Also Some Visible Damage to Tunnel Rebar and Steam Support Structure. the Design Professional Will Be Responsible for an Initial Phase 100 Study Outlining the Extent of Existing Damage, Cause of Infiltration, and Develop Strategies for Addressing the Damage / Remediation. the Initial Study Should Include Cost Estimation of Remediation Efforts. Following This, the Design Professional Will Be Responsible for Developing Phase 400 and Phase 500 Documentation of Repair and Remediation Work Including Civil, Structural, Architectural, and Any Mechanical or Electrical Re-routing Involved During Construction. They Will Also Be Responsible for Phase 600-700 Construction Administration. All Questions Should Be Emailed to Jared Gavinhelfrich at Gavinhelfrichj@michigan.gov Address No Later Than 2:00 P.m., Eastern on Monday December 11, 2023.

Post-Bid

Bridges / Tunnels

$850,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
100
Bidding Soon
1,319
All Active Projects
568
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

January 15, 2024

img_map_placeholder

7432 Parsons Dr, Windsor charter Township, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.