BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Plano, Texas. Completed plans call for the renovation of a educational facility.

CSP #2024-01-010 Harrington Elementary School HVAC Upgrades COMPETITIVE SEALED PROPOSALS FOR CSP# 2024-01-010 Harrington Elementary School HVAC Upgrades for the Plano Independent School District will be received at the Plano Independent School District Purchasing Department, 6600 Alma, Plano, Texas 75023. Each Proposer shall identify their sealed Proposal by typing on the outside of the envelope: PROPOSAL NAME" FOLLOWED BY THE CORRESPONDING CSP # AS SHOWN BELOW. Harrington Elementary School HVAC Upgrades CSP #2024-01-010 Proposals received by hand delivery or mail after the stated receipt date and time will be rejected. SCOPE OF WORK: Mechanical and Electrical Building Systems, to include minor Structural and Roofing work, related to the replacement of existing air-cooled chillers, gas fired boilers, all chilled and heating water pumps, seven (7) chilled and heating water air handling units, associated roof mounted equipment, piping and ductwork, accessories and power supply revisions. One (1) gas fired roof top unit and new curb will be replaced in the Gymnasium. The existing automatic wet alarm valve assemblies at the fire riser header will be replaced. All existing HVAC controls will be replaced throughout the facility. Estimated Budget - $1,717,000 includes $150,000 Owner's Contingency Date for Construction Agreement: Presented to the Board on or about January 16, 2024. Owner reserves the right to reject any or all bids and to waive irregularities or informalities as may be deemed in Owner's interest. The Board of Trustees, for the purpose of complying with Section 2258, Subchapter B of the Texas Government Code for all public contracts, has adopted the prevailing wage rates as determined by the United States Department of Labor in accordance with the Davis-Bacon Act as the published rates for the District. Deadline for Questions: November 30, 2023 @ 4:00 pm CST

Post-Bid

Educational

$1,717,000.00

Public - City

Renovation

33

13

2

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
100
Bidding Soon
3,589
All Active Projects
1,423
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.