BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Fishermans Harbour, Nova Scotia. Completed plans call for the renovation of a playground / park / athletic field.

This is a two-stage selection process. Bidders responding to this selection process are requested to submit a bid in two stages. This posting is the first stage (Stage One) of a two-stage solicitation process: the first stage will evaluate the qualifications of all interested suppliers; the second stage (Stage Two) will invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Stage Two the pre-qualification list will expire and will not be used in any other solicitation. The qualification list will expire within 180 days or upon award of a contract in Stage Two, whichever is earlier, and the prequalification list will not be used in any other solicitation. Parks Canada requires the furnishing of all labour, materials and equipment required to construct a new green micro-grid power generation system at Sable Island National Park Reserve (SINPR) to generate electricity. The system combines zero-carbon sources (21.8 kW Solar PV) with more efficient, lower carbon, generation technology (2 x 45 kW variable speed gensets) in an advanced micro-grid with a battery energy storage system (190 kWh capacity). The project goal is to reduce GHG emissions by 50% from current levels. This is conjunction with energy efficient building retrofits (heat pumps and lighting controls) to reduce the electrical demand. Sable Island National Park Reserve is located offshore in the Atlantic Ocean, 190 km from the nearest landfall in Nova Scotia. Due to its remoteness, the island's operations depend on transportation of all people and cargo to the island by either air or sea and the construction period is constrained by the sealift schedule and bird nesting. The following is a highlight of some of the scope: 1. Removal of two existing fixed speed diesel electric generators from the Garage Building. 2. Installation of two new parallel capable, variable speed, diesel electric generators c/w heat recovery system in the Garage Building. 3. Installation of a new DC coupled solar photovoltaic array and containerized energy storage system. 4. Installation of a new microgrid controller to manage the output of the energy storage system and two new generators to meet the electrical demand of the island. 5. Installation of occupancy sensor-based lighting controls in the Garage, Carpentry Workshop, Food Stores, and Water Treatment Buildings. 6. Installation of new heating systems in the Garage, Carpentry Workshop, and Food Stores Buildings. 7. Replacement of electrical distribution equipment throughout Main Station at SINPR Work is to be completed by November 30, 2025. This project is estimated at a value between $1,000,001 > $5,000,000, Taxes extra. Documents can be obtained at: https://canadabuys.canada.ca/en/tender-opportunities

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
11
Bidding Soon
94
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 28, 2023

January 29, 2024

img_map_placeholder

Sable Island National Park, Fishermans Harbour, NS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.