BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2024 at 7:00 PM

Updated April 16, 2024

Site work and paving for a road / highway in Bradenton, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

https://thebradentontimes.com/stories/city-releases-12-million-gallons-of-sewage-into-manatee-river,76627 BRADENTON - On Wednesday, approximately 1.2 million gallons of mostly raw sewage was bypassed and discharged into the Manatee River. "At 12:10 pm the city water Reclamation Facility experienced an operational failure," read the FDEP pollution notice. "The filter system had a blockage of the media causing 1.2 million gallons of partially treated wastewater to be bypassed into the Manatee River. The bypass was closed at 5:10 pm and the river sampling was started. City staff cleaned the aeras affected and a normal operation resumed." In 2022, the city settled a lawsuit regarding wastewater spilling into the Manatee River, agreeing to improve its wastewater infrastructure significantly. "When do we seek an injunction for the city to stop development they can't handle" asked former Manatee County Commissioner and TBT publisher Joe McClash. "The fact that there are so many units under construction downtown and several times a year raw sewage is released gives rise to the fact that they can't handle what they already have. They could have an interconnect with the county to handle any problems in the future. Until then, there shouldn't be any certificates of occupancy issued." ______________________ Upper Manatee River Road Rtu #330 Rehabilitation Each Bidder shall examine all IFBC documents and will judge all matters relating to the adequacy and accuracy of such documents. Any questions or requests concerning interpretation, clarification or additional information pertaining to this IFBC, including the sample Agreement, shall be made in writing via email to the Manatee County Procurement Division to the Designated Procurement Contact or to purchasing@mymanatee.org. All questions received and responses given will be provided to potential bidders via an addendum to this IFBC. The deadline to submit all questions, inquiries, or requests concerning interpretation, clarification or additional information pertaining to this Invitation for Bid Construction to the Manatee County Procurement Division is January 5, 2024. Questions and inquiries should be submitted via email to the Designated Procurement Contact shown below. DESIGNATED PROCUREMENT CONTACT: Leslie Peer, Procurement Agent III (941) 749-3062, Fax (941) 749-3034 Email: leslie.peer@mymanatee.org Manatee County Financial Management Department Procurement Division *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Roads / Highways

$659,635.00

Public - County

Paving, Site Work

11

18

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
355
Active Projects
175
Bidding Soon
2,123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2024

March 22, 2024

Project location map

Upper Manatee River Rd, Bradenton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.