BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Houston, Texas. Completed plans call for the renovation of a educational facility.

1. Gulfton Secondary (6565 De Moss Dr. Houston, Texas 77074) 2. Northside Secondary (5215 Jensen Dr. Houston, Texas 77026) 3. Southeast Secondary (353 Crenshaw Rd. Houston, Texas 77034) Awarded contractor shall assume full responsibility for the overall supply of any/all products, materials, machinery, and manpower required for site prep, demo, and the full build/install of the Gulfton, Northside, and Southeast Secondary gymnasium flooring renovations. Project shall consist of but not limited to Temporary safe removal and storage of any gymnasium F.F.E. including bleachers "as required" for fulfillment of flooring replacement scope. Removal and disposal of existing gym flooring & underlayment and components. Work Surface Preparation, "as required by flooring manufacturer." Installation of high impact interlocking tile, modular flooring; resilient acoustic underlayment system. "Scope shall include base and thresholds as necessary." Contractor shall "salvage for reuse" all threshold transitions. Contractor shall provide new base mold at full perimeter of installation. NCAA Regulation game lining/marking paint, or tape, as recommended by sport surface manufacturer. Contactor to confirm details of Striping layout prior to Striping. Include volleyball attack lines 10' off the center court. Final clean and replacement of gymnasium F.F.E as directed by owner. Actual work to be performed and the schedule for performance under this solicitation will be upon the terms, conditions, and timelines agreed upon by YES Prep and the selected contractor. Time is of the essence for this project. All items listed in the scope of work shall be completed no later than the date agreed upon contract award. Deadline will not be moved due to rainy days. Question cutoff time and date is 5:00 PM November 27th, 2023. Proposers are required to complete all sections provided in the ebid system. Gym Flooring Replacement YES Prep reserves the right to reject any or all proposals or waive any or all irregularities.

Post-Bid

Sidewalks / Parking Lot

$450,000.00

Public - City

Renovation, Site Work

7

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2023

May 31, 2024

img_map_placeholder

Multiple Locations, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.