Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Alva, Oklahoma. Conceptual plans call for site work for a water / sewer project.
The Avard Regional Rail Park Authority is developing an industrial park located in the E1/2 of Section 23 T26N, R14WIM. The park is generally located approximately 6 miles south of the City of Alva on US Hwy 281. The park will consist of various sized tracts suited to serve light to heavy industrial users. The first phase of the development consists of the Construction of water supply, water distribution, sanitary sewer collection and sewage treatment systems serving the proposed industrial park. The water supply and fire protection demand of the facility is 300,000 gallons per day with a phase one sanitary sewer collection and treatment system demand of 800 equivalent population. The water supply portion of the project consists of the construction of multiple offset and/or newly located water wells and water well field transmission facility improvements in the City of Alva Well Field. The water distribution system project will consist of the interconnection into the the City of Alva water transmission facilities with the extension of mains along the east, south and north boundaries of the site. The sanitary sewer treatment system will potentially consist of a total retention facultative lagoon facility serving a population equivalent 800. The Sanitary sewer collection system will consist of gravity mains, a lift station and a force main. The Avard Regional Rail Park Authority is requesting engineering qualifications for a potential ARPA funded for a water supply, water distribution, sanitary sewer collection and sewage treatment systems project. The industrial park shall be located at E1/2 of Section 23 T26N, R14WIM, 6 miles south of the City of Alva on US Hwy 281 Project Deliverables to include: The main project deliverables shall be as follows: - Engineering Report including the following o Hydraulic Analysis o Life cycle cost-benefit analysis o Recommendations o Cost estimates o Preliminary Plans and Specifications for the Project o Conceptual plans - Design Plans and Construction Permit - Bidding and Contracting Process/Procurement of Construction Services - Engineering During Construction - Survey and Construction Staking - Inspection Services Please contact Stan Bixler, ARRPA Board Chairman at 580-829-3574, email: bixler@pldi.net, if you have any questions. Design and Engineering services should begin immediately atier the selection is made. Work shall commence immediately following selection and contract negotiation process. Design is expected to be complete within 120 days of contract execution. The method of Contractor Selection has not been Determined at this time
Conceptual
Water / Sewer
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2024
Multiple Locations, Alva, OK
Related To This Project
Alva, OK
Bid Date: Feb 12 2024
Alva, OK
Bid Date: Jun 17 2021
Alva, OK
Bid Date: Mar 01 2024
Alva, OK
Bid Date: Feb 27 2024
Alva, OK
Bid Date: Apr 18 2024
Alva, OK
Bid Date: Apr 11 2024
Alva, OK
Bid Date: May 01 2024
Alva, OK
Bid Date: Apr 18 2024
Alva, OK
Bid Date: Nov 17 2023
Water System Improvements Water Main Replacement Along Locust St. From 9th St. to 11th St. - 5187685
Alva, OK
Bid Date: Feb 12 2024
Alva, OK
Bid Date: Jan 20 2022
Alva, OK
Bid Date: Sep 15 2023
Alva, OK
Bid Date: Jul 18 2023
Alva, OK
Bid Date: Jun 22 2023
Alva, OK
Bid Date: Jun 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.