Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Berwick, Nova Scotia. Contact the soliciting agency for additional information.
Reference Number 0000259914 Question Acceptance Deadline 2023/12/01 12:00:00 AM AST Duration: 1 year This section details the scope of work, requirements and deliverables for the services requested under this RFP. AREA's goal is to ensure the Towns experience the lowest cost, and most favourable risk profile, of maintaining and operating the listed solar PV systems over the lifetime of the assets. The scope of work in this RFP is not written to be all-inclusive or prescriptive and should be used as a guide. AREA welcomes suggestions, recommendations, methods, appropriate and applicable design standards, industry best practices, and further details from Proponents on the work and deliverables to be performed as part of the Approach & Methodology section of their Proposal. Where applicable, all drawings, designs, reports or other technical materials shall be developed to the latest applicable and relevant standards, rules, codes, design principles, etc. including but not limited to, the following: Canadian Electrical Code (CEC), Canadian Standards Association (CSA), International Electrotechnical Commission (IEC), American Society for Testing and Materials (ASTM), Institute of Electrical and Electronics Engineers (IEEE), and any other relevant federal, provincial or municipal codes, regulations or legislation. AREA's technical staff will be taking an active role in providing input and direction to the successful Proponent during the term of the engagement. No other technical studies have been prepared, and no other information, outside of what is included with this RFP, and accessible through publicly available sites such as provincial open data portals, is available to Proponents. AREA expects the selected OMAM firm to propose a plan to address the following scopes, using industry best practices, in order to maintain the system health and optimize energy production from the asset during its lifetime. If a Proponent believes that any of the below steps are unnecessary or that a necessary step has been omitted in this RFP, then the Proponent shall justify such in the Approach and Methodology Section. Preventative Maintenance Visual review and inspection frequency Infrared equipment imaging Drone (or other) IR imaging vs. IV curve tracing Torque verification Equipment maintenance (manufacturer requirements) Spare parts management Warranty management Safety Technical inspection scope and frequency Corrective Maintenance Necessary repairs, replacements or adjustments to mitigate any risk to the system, minimize down time and adjust settings to optimize energy generation. Pre-qualifying third party contractors QA/QC process Troubleshooting Dispatching in-house vs. sub-contractor resources Technical reporting Roles & Responsibilities Asset management and reporting Monitoring for energy generation performance and alarm conditions Establishing AREA/owner municipality/Proponent role Dispatch of in-house vs. sub-contractor resources AC vs. DC activities and assignment of responsibility KPI Analysis Insurance claims assistance Facility documentation Vegetation management Inspection and maintenance of site erosion and sedimentation control features Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Solar Power Generation
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 22, 2023
January 22, 2024
Multiple Locations, Berwick, NS
Related To This Project
Berwick, NS
Bid Date: Feb 28 2024
Berwick, NS
Bid Date: Apr 09 2024
Berwick, NS
Bid Date: Apr 19 2024
Berwick, NS
Bid Date: May 09 2024
Berwick, NS
Bid Date: May 17 2024
Berwick, NS
Bid Date: Sep 12 2024
Berwick, NS
Bid Date: Nov 14 2024
Berwick, NS
Bid Date: Dec 06 2023
Berwick, NS
Bid Date: Nov 29 2023
Berwick, NS
Bid Date: Nov 29 2023
Berwick, NS
Bid Date: Nov 29 2023
Berwick, NS
Bid Date: Dec 28 2023
Berwick, NS
Bid Date: Dec 16 2021
Berwick, NS
Bid Date: Jul 06 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.