BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Question Deadline 12/01/2023 at 11:00 AM CT Questions relating to this bid must be submitted in writing online Drainage Improvements in Prado Woods Subdivision for Harris County Precinct 3 Question Deadline 12/01/2023 at 11:00 AM CT Questions relating to this bid must be submitted in writing online Drainage Improvements in Prado Woods Subdivision for Harris County Precinct 3 The Prado Woods Subdivision Drainage Improvements - 2018 project site consists of subdivision drainage improvements along 0.42 m iles of Prado Woods Street, from dead end to Grant Road. The proposed improvements include upgrading the existing storm sewer system on Prado Woods Street to increase drainage capacity and minimize the risk of structural flooding in the subdivision during a NOAA Atlas 14 100-year storm event. Improvements to the roadway include realignment of the roadway, replacing the existing 20-feet concrete roadway with 28-feet B-B concrete curb and gutter roadway. The existing driveways will be replaced to the right of way. The storm sewer improvements include 414 linear feet (LF) of 24-inch RCP, 900 LF of 3'x2' RCB, 632 LF of 4'2' RCB, including inlets and junction boxes. The existing pavement, sidewalks with wheelchair ramps will be replaced to the curb returns along Grant Rd, along with relocating any existing utilities, as needed. Other improvements include restoring the site with hydromulch seeding and sodding, as well as connecting the existing yard drains to the new storm sewer system. The existing private water lines will be relocated as needed to avoid conflicts with proposed roadway and storm sewer system. B. The overall objective for this project is to improve the storm sewer system to reduce flooding along Prado Woods Street, that drains to Grant Road storm sewer system. C. The "Time of Completion" of this construction contract will be 120 working days (defined as consecutive calendar days).

Award

Water / Sewer

$2,062,060.00

Public - City

Site Work

77

10

5

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
77
Bidding Soon
2,757
All Active Projects
972
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

March 18, 2024

img_map_placeholder

Multiple Locations, Houston, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.