BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Manchester, New Hampshire. Completed plans call for the renovation of a medical facility.

The Manchester VA Medical Center is located at 718 Smyth Road, Manchester, NH 03104. Building 1 was constructed in 1948. The primary goal of this construction project is to replace the two air-cooled chillers outside of the building 1 penthouse. The chillers were previously replaced in 2004 and new 6" O chilled water risers were installed recently. The proposed construction will replace the existing chillers with two 175-tonYork YLAA200 Chillers. Larger chillers require upsizing electrical, structural, and existing primary chilled water pumps P-1 and P-2. This report documents the detailed replacement design with a proposed piping layout, temporary chiller location, and phasing plan. The new chilled water primary loop will connect to the existing buffer tank on the roof. A new bypass with valves will be installed to isolate the tank if required. In addition to replacing the chillers, the secondary chilled water loop will be upgraded. The existing pumps P-4, P-5, P-6, and P-7 will be demolished and replaced with two larger pumps. The proposed phasing plan is in the design approach section of AE narrative. Dumbwaiter will be removed for use of electrical conduit chase. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Date 02/01/2024 2 PM The period of period of performance (PoP) of this contract once mobilized is 365 calendar days.

Bid Results

Medical

$3,615,400.00

Public - Federal

Renovation

66

40

16

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
192
Bidding Soon
2,400
All Active Projects
1,066
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 7, 2025

img_map_placeholder

718 Smyth Rd, Manchester, NH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.