Find the next project before your competition does.

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 7, 2023 at 7:00 PM

Updated January 29, 2024

Demolition and renovation of an educational facility in Austin, Texas. Completed plans call for the demolition of a educational facility; and for the renovation of a educational facility.

Flintco, as the Construction Manager, is requesting Subcontractor's Lump Sum Bid Proposals for work related to the UT Boiler 1 and 2 Replacements. This project involves removal and replacement of Boilers 1 and 2 at the PPL building located at 301 E 24th Street, Austin, Texas 78701. The proposals being requested are for the following scopes of work: 1. Site Maintenance and Access 2. Demolition and Abatement of Existing Boilers and Related Hazardous Materials 3. Piping - Make Safe for Demolition and Re-Route of Existing Services / Provision of Temporary Piping a. Concrete for Pipe Stands b. Miscellaneous Metals for Pipe Supports 4. Electrical - Make Safe for Demolition and Select Electrical Gear - Variable Frequency Drives (VFD's) and Automatic Transfer Switch Please provide a courtesy response of your intent by accepting or declining the proposal invitation via Building Connected or by contacting Shannon Brunner at (512) 822-7468 and/or shannon.brunner@flintco.com . Question Deadline 12/06/2023 at 2:00 PM CT Request for Information related to the contract documents are due to Flintco

Post-Bid

Educational

$4,000,000.00

Public - State/Provincial

Demolition, Renovation

63

25

19

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
110
Bidding Soon
3,211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed