Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Vinton, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.
bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. Schedule: Work on the improvement shall be commenced on or before the date specified in the written "Notice to Proceed" and shall be fully completed and ready for acceptance within 100 working days. Working days will not be charged from October 1, 2023 to April 1, 2024. Late start date of April 1, 2024. Liquidated damages in the amount of $1,200.00 per calendar day will be assessed for each day that the work shall remain uncompleted after the end of the contract periods, with due allowance for extension of the contract period due to conditions beyond the control of the contractor, as approved by the Linn County Conservation Board. The HMA Trail Preservation Bituminous Fog Seal shall be completed by the Contractor a minimum of three (3) months after completion of paving after the working days allocation. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 10% of the amount of the contract. The bidder's security shall be in the amount fixed in the Instruction to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the specifications. The Linn County Conservation Board reserves the right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bids and no bid may be withdrawn during this period. The Linn County Conservation Board does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the jurisdiction.
Post-Bid
Roads / Highways
$250,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2023
April 1, 2024
IA-150 & 31st Ave, Vinton, IA
Related To This Project
Vinton, IA
Bid Date: Jan 17 2024
Vinton, IA
Bid Date: Jan 17 2024
Vinton, IA
Bid Date: Mar 15 2024
Vinton, IA
Bid Date: Apr 08 2024
Vinton, IA
Bid Date: Apr 16 2024
Vinton, IA
Bid Date: Mar 31 2024
Vinton, IA
Bid Date: Apr 29 2024
Vinton, IA
Bid Date: May 21 2024
Vinton, IA
Bid Date: Nov 08 2023
Vinton, IA
Bid Date: Nov 21 2023
Vinton, IA
Bid Date: Nov 16 2023
Vinton, IA
Bid Date: Oct 24 2023
Vinton, IA
Bid Date: Mar 22 2022
Vinton, IA
Bid Date: Feb 15 2022
Vinton, IA
Bid Date: Aug 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.