Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 7, 2024 at 7:00 PM
Updated February 9, 2024
Renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.
Construction Services for phase 2 of chilled water connections on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The University is in the process of shifting from a building by building cooling approach, to more interwoven district approach because of an ever increasing costs of aging HVAC equipment in particular buildings. Three buildings on the East bank campus; namely Scott Hall located at 72 Pleasant Street South East, Wulling Hall located at 86 Pleasant Street South East, and Elliot Hall located at 75 East River Parkway, Minneapolis, MN 55455, have such aging equipment. This equipment, which includes a reciprocating chiller with a dead com pressor, is held together with a variety of aged chilled water equipment that includes 2 absorption chillers. The equipment (e.g. Wullling), has a chiller that has reached or near the end of its useful life and also has an obsolete R-22 refrigerant that will be retired once the new MEP chiller plant will come on board and in use in 2023. This will greatly save costs of running 3 obsolete chiller plants in that location. The University seeks the services of a contractor for the Phase 2 work that will install and extend these branch piping inside both Wulling and Elliot Halls. c) Permitting is required for various components of this Project. The University's Project Manager will cooperate in the application for building and other permits. The selected Respondent will be required to obtain and pay for all required permits, assessments, and governmental fees, licenses, and inspections, excluding Sewer Availability Charges and Water Access Charges assessed by the Metropolitan Waste Control Commission Wulling Hall has been connected through a direct buried HDPE line through a shallow tunnel. This is the line that will be extended to the Mechanical Penthouse. Elliot Hall has been connected with a buried HDPE line to the basement level where the connection will be extended and rise up to the Mechanical Penthouse. Wulling Hall has been connected through a direct buried HDPE line through a shallow tunnel. This is the line that will be extended to the Mechanical Penthouse. Elliot Hall has been connected with a buried HDPE line to the basement level where the connection will be extended and rise up to the Mechanical Penthouse. Question Deadline 12/05/2023 at 12:00 PM CT The total construction budget for this Project is $320,000 (current dollars, no escalation). The University requires the Project to be substantially complete by no later than March 29, 2024. Permitting is required for various components of this Project. The University's Project Manager will cooperate in the application for building and other permits. The selected Respondent will be required to obtain and pay for all required permits, assessments, and governmental fees, licenses, and inspections, excluding Sewer Availability Charges and Water Access Charges assessed by the Metropolitan Waste Control Commission. The University reserves the right to contact any noted references, consider other references, or consider Respondent's documented past performance at the University.
Award
Educational
$320,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 8, 2024
January 25, 2024
Multiple Locations, Minneapolis, MN
Related To This Project
Minneapolis, MN
Bid Date: Dec 19 2023
Minneapolis, MN
Bid Date: Dec 14 2023
Minneapolis, MN
Bid Date: Nov 27 2023
Minneapolis, MN
Bid Date: Feb 06 2024
Minneapolis, MN
Bid Date: Dec 12 2023
Minneapolis, MN
--
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Dec 19 2023
Minneapolis, MN
Bid Date: Dec 20 2023
Minneapolis, MN
Bid Date: Nov 21 2023
Minneapolis, MN
Bid Date: Dec 14 2023
Minneapolis, MN
Bid Date: Dec 14 2023
Minneapolis, MN
--
Minneapolis, MN
Bid Date: Dec 12 2023
Minneapolis, MN
Bid Date: Dec 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
