BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Minneapolis, Minnesota. Completed plans call for the renovation of a educational facility.

Construction Services for phase 2 of chilled water connections on the east bank of the Twin Cities campus. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements. The University is in the process of shifting from a building by building cooling approach, to more interwoven district approach because of an ever increasing costs of aging HVAC equipment in particular buildings. Three buildings on the East bank campus; namely Scott Hall located at 72 Pleasant Street South East, Wulling Hall located at 86 Pleasant Street South East, and Elliot Hall located at 75 East River Parkway, Minneapolis, MN 55455, have such aging equipment. This equipment, which includes a reciprocating chiller with a dead com pressor, is held together with a variety of aged chilled water equipment that includes 2 absorption chillers. The equipment (e.g. Wullling), has a chiller that has reached or near the end of its useful life and also has an obsolete R-22 refrigerant that will be retired once the new MEP chiller plant will come on board and in use in 2023. This will greatly save costs of running 3 obsolete chiller plants in that location. The University seeks the services of a contractor for the Phase 2 work that will install and extend these branch piping inside both Wulling and Elliot Halls. c) Permitting is required for various components of this Project. The University's Project Manager will cooperate in the application for building and other permits. The selected Respondent will be required to obtain and pay for all required permits, assessments, and governmental fees, licenses, and inspections, excluding Sewer Availability Charges and Water Access Charges assessed by the Metropolitan Waste Control Commission Wulling Hall has been connected through a direct buried HDPE line through a shallow tunnel. This is the line that will be extended to the Mechanical Penthouse. Elliot Hall has been connected with a buried HDPE line to the basement level where the connection will be extended and rise up to the Mechanical Penthouse. Wulling Hall has been connected through a direct buried HDPE line through a shallow tunnel. This is the line that will be extended to the Mechanical Penthouse. Elliot Hall has been connected with a buried HDPE line to the basement level where the connection will be extended and rise up to the Mechanical Penthouse. Question Deadline 12/05/2023 at 12:00 PM CT The total construction budget for this Project is $320,000 (current dollars, no escalation). The University requires the Project to be substantially complete by no later than March 29, 2024. Permitting is required for various components of this Project. The University's Project Manager will cooperate in the application for building and other permits. The selected Respondent will be required to obtain and pay for all required permits, assessments, and governmental fees, licenses, and inspections, excluding Sewer Availability Charges and Water Access Charges assessed by the Metropolitan Waste Control Commission. The University reserves the right to contact any noted references, consider other references, or consider Respondent's documented past performance at the University.

Award

Educational

$320,000.00

Public - State/Provincial

Renovation

18

12

52

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
790
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2024

January 25, 2024

img_map_placeholder

Multiple Locations, Minneapolis, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.