BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Greenwood, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of January 8, 2024, project was awarded to Hawkinson Construction Co., awarded amount is $3,045,666.66.** Mill Bituminous Surface, Bituminous Pavement Reclamation, Base Stabilization, Plant Mix Bituminous Aggregate Surfacing County project no. 0115-669552 Expected Award Date:12/19/2023 Project Start Date:05/20/2024 Construction Start Date:05/20/2024 Construction End Date:08/10/2024 This Work consists of using intelligent construction technology (ICT) to monitor compaction and placement operations in accordance with MnDOT 2215 Stabilized Full Depth Reclamation (SFDR), 2390 ColdIn-Place Recycled (CIR) Bituminous and Cold Central Plant Recycling (CCPR) Bituminous, 2353 Ultrathin Bonded Wearing Course (UTBWC), 2360 Plant Mixed Asphalt Pavement and 2365 Stone Matrix Asphalt (SMA). ICT consists of Paver Mounted Thermal Profile (PMTP) and Intelligent Compaction (IC) Methods. PMTP Method continually monitors the surface temperature of the mat immediately behind the trailing edge of the paver screed during placement operations. IC Method continually monitors compaction efforts during grading and/or asphalt paving operations. Incorporate a Safety Edge in the plant mixed asphalt pavement on all pavement edges including centerline and outside edges. The finished shape of the Safety Edge shall conform to the cross-section drawings shown in Exhibit A and Exhibit B. The Safety Edge shall be constructed monolithically with the pavement. Furnish, install, maintain, and remove all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Do not close streets or highways, or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary.

Award

Roads / Highways

$3,045,667.00

Public - County

Paving, Site Work

35

3

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
82
Bidding Soon
778
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

May 20, 2024

img_map_placeholder

Multiple Locations, Greenwood, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.