BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Danville, Illinois. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Questions regarding bids may be directed to Tracy Craft 217-431-2271 or 217-213-1309. The City of Danville is an Equal Opportunity and Affirmative Action Employer. This work shall consist of the demolition and clearing of the structure(s) described in these documents for both 210 & 212 N Bowman. In general, work includes the following; demolition and clearing debris, trees, and all overgrowth, also the sealing of sewer connections, demolition, and disassembly of the project structures, removing concrete slabs, for the proper slope and drainage that will need to be executed. 1. The Contractor shall execute the work in such a manner so as to avoid unnecessary interference with the use of streets and alleys by the public. Contractor shall furnish, install, maintain, and operate all means of protection of life and property (of both its employees and the general public) by the use of barricades, signal devices, lights, and other equipment as required by IDOT, OSHA and the Illinois Department of Labor. Hard hats, safety glasses, and high visibility clothing are required to be worn at all times. 2. All construction, demolition, and other land disturbing actives must use perimeter silt fence, soil stabilization, stabilized construction entrances, and/or other means, as necessary to adequately protect the site from erosion and sediments losses. THE CITY WILL PROVIDE WATTLE EROSION for the contractor to put down after the removal of dirt to create the proper slope for drainage. 3. Any work that in any way encumbers public property shall not be commenced until the Contractor has secured a Contractor's Permit, from the City Engineer, to close/barricade the streets or sidewalks. The Contractor shall also be responsible for all permitting, traffic control and coordination with the City for any and all work that impacts the City right of way. 4. The City of Danville has already arranged and completed al utility retirements to said properties of 210 & 212 N Bowman. The City of Danville will be responsible for demolition permits. 5. Sanitary sewers and storm sewers, if any, shall be disconnected and permanently sealed off at or near the property line. The Contractor shall accurately establish and stake the location and depth of these sewers. This information shall be transmitted to the City Engineer for record. The Contractor shall notify the Plumbing Inspector, or designee, for inspection before a sewer is covered up. Return the sewer and sanitary notice signed by the Inspector. The City will assist in the location of the sewer main and building lateral location. This method will also be used in confirmation that they are sealed properly prior to demolition. 6. Vegetation & tree removal on properties shall be done for final grading of lots (shown in Figures 1 & 2). 7. The buildings shall be demolished and removed with minimum disturbance to the general public. If dust generated by the demolition is excessive or a nuisance, the Contractor shall apply a sufficient volume of water on each building in order to remove this annoyance and hazard. The Building Inspector or other City representative shall have the right to direct the Contractor to spray the building when Tracy feels is necessary for the public good. A two (2) inch minimum hose shall be provided for each building, of such length as required to attach to the nearest and hydrant shall be continuously staffed for this purpose. Contractor is responsible for coordination of acquiring sufficient water supply. The local water system is owned by Aqua Illinois and it is the responsibility of the Contractor to comply with their regulations. 8. After the Contractor is notified to proceed, all material and equipment resulting from the demolition shall be the property of the Contractor and shall be removed from the premises within five (5) days after the building has been demolished. No materials or equipment shall interfere with or block vehicular or pedestrian traffic. 9. The building(s) (including concrete slabs on grade or otherwise, walls, footings, columns, piers, and foundation walls) shall be completely removed. Basement floor areas shall be excavated to granular material and all interior walls and footings shall be completely removed. 10. All concrete, asphalt, or other hard surfaces, including sidewalks, driveways, and parking lots shall be removed with the exception of those within the City right of way.

Bid Results

Residential Subdivision

$23,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
45
Bidding Soon
612
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2023

December 6, 2023

img_map_placeholder

Multiple Locations, Danville, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.