BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2024 at 7:00 PM

Updated February 9, 2024

Renovation of a detention facility in Smith Crossing, New Brunswick. Completed plans call for the renovation of a detention facility.

This is the second phase (Phase Two) of a two-phase process: the second phase (Phase Two) invites qualified suppliers to provide a financial bid on the project based on the specifications and drawings. To replace aging and failing domestic water copper piping throughout the Atlantic Institution located in Renous, New Brunswick. In general, work under this contract consists of, but is not limited to the following: Replace existing domestic water copper piping NPS 3 and under with new PEX-A piping. Supply and install pipe insulation, jacketing, hangers, saddles, support, sleeves, fittings, firestopping systems. Re-use/re-install existing plumbing fixtures and accessories. The Contractor shall perform and complete the Work within 135 weeks from the date of notification of acceptance of the offer. The estimated cost for this opportunity is within the following cost category: between $5,000,001 to $20,000,000 (HST excluded). Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity.

Post-Bid

Jails / Prisons

$20,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
18
Bidding Soon
229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

March 1, 2024

Project location map

13175 NB-8, Smith Crossing, NB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.