BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Jefferson, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Location: Us-6/192nd St Interchange, Omaha In County: Douglas Calendar Days: 265 Price Range: $10,000,000.00 to $20,000,000.00 This project is funded under the Federal-Aid Highway Act, all appropriate Federal requirements will apply. The Department reserves the right to change these quantities without notice. The last day to submit acceptable prequalification statements for this letting is by 5:00 P.M. on Saturday December 9, 2023. NE DOT - 200 - Concrete Pavement, General (All Classes) A. Shall be a single panel and surface mounted housing. Housing shall provide termination capabilities, splice protection, and associated fiber optic cable and terminated fiber connector storage. B. Shall be the same manufacturer as Connector Adaptor Panel. C. Fiber Connector Housing manufacturer shall be Corning, Commscope, or approved equal. This work includes furnishing and installing preemption control systems, and all other miscellaneous items necessary to provide an operable system as indicated in the Contract Documents. Required submittals are material certifications, working drawings, and manufacturer's installation recommendations. This project will modernize the existing interchange of US-6 /Street and 192nd Street. All ramps would be reconstructed and 192nd Street between the ramp terminals updated as necessary. Preliminary layout and Grading for future Eastbound widening of US-6 from 3 to 4 lanes from 204th St to 192nd St interchange ramps and 192nd St to 180th St Interchange Ramps and the widening of Westbound US-6 from 3 to 4 lanes from 180th St to 192nd St interchange ramps will be completed in order to properly orientate ramps and avoid re-construction or conflicts that may arise if grading was completed with the future projects. Existing West Road mainline bridges over 192nd Street will be assessed and used in place if possible. Existing street lighting will be removed and replaced as necessary *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$11,166,550.00

Public - State/Provincial

Paving, Site Work

537

12

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
45
Bidding Soon
485
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 14, 2023

April 1, 2024

img_map_placeholder

Multiple Locations, Jefferson, NE

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.